Loading...
CF-TownC CHC-CS 860206 TEXAS POWER & LIGHT COMPANY P. O. Box 819061 · Dallas, Texas 75381-9061 February 6, 1986 Mr. Nd Powe11, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Dear Mr. Powe11: I have reviewed your request for permanent service to the Town Center Complex. Please be assured that Texas Power & Light Co. is most interested in providing you the most economical and reliable service available. It is this interest that has lead us to our present situation. A normal design for this project (see attachment #1) incorporates an overhead extension along Parkway Blvd. to the Town Center Complex, then underground to a transformer. This proposal was rejected by the City's representatives because of the aesthetic impact it would have on Parkway Blvd. An underground alternative was designed to provide permanent service that did not require overhead along Parkway Blvd. to serve this development (see attachment #2). The Public Utility Commission mandates a customer to pay the difference in cost between our normal service (in this case attachment #1) and requested service (in this case attachment #2). For this project, the city would be required to pay $26,200. With further analysis, our project engineer (Glenn Fabian) developed an unusual procedure that would provide the city with permanent service at a much lower cost and minimize the effect of overhead lines. The procedure is as follows: 1. Working closely with Univest, Mr. Fabian explained his goal - to minimize the aesthetic effects of overhead lines and minimize costs to the city. He explained that he could accomplish this if Univest would cooperate and grant Texas Power & Light permission to build an overhead line across their development under the constraint that it would later be removed at no cost to Univest (see attachment #3). This in effect would provide the equivalent service as shown in attachment #1 but from a different direction. There are no charges to the City from T.P.&L. for this phase of the work. 2. The City would be requested to install conduit (see attachment #3) that would compliment the final plan (attachment #4). A DIVISION OF TEXAS UTILITIES ELECTRIC CO. FORM 16-B I TEXAS POWER & LIGHT COMPANY 3. At some future date, at Univest's request, the service to the Town Center Complex would be adjusted and be tied to an extensive underground system with the Univest project (see attachment #4). Univest and the City would participate in the cost for moving the City's service from the overhead system to the underground system. Univest's portion of the cost will be the relocation of an underground primary feed to the Town Center Complex's transformer. The City's portion of the cost will be the removal of the overhead line that crosses Univest's property (cost is $2,369.00). As noted on attachment #5, Mr. Wayne Ginn was notified of the cost for this unusual procedure (however, we did not detail this procedure). On attachment #6 please note our understanding of the City's acceptance of the cost for this procedure. Our biggest concern is to provide the City with economical and reliable service. I have outlined our process of determining our charges to the city. Please advise as to the conditions you wish Texas Power & Light Company to consider for service. Very truly yours, District Engineer FWG:ljg cc: H. Wayne Ginn, P.E., Consulting Engineer John Weinberg - Texas Power a Light a:fg2-6-86 ZONING MAP ,, , Town Center ~ 218.4 ac. Town Home 2 1;;;~;;;I 92.7 ac. Single F~ilyOIIIIIl~l~llll{ 104.6 ac. Multi Family 2~ 116.7 ac. Single Family 7~ 5o.s ac. Commercial F-----~+:+I15.3 ac. 'City Park b~~t 167.9 ac. , TOTAL 766.1 :~c. NORTH ROAD SANDY LAKE __. date: february 1983 '"] ZONIN MAP Single F~ily OIIIIII~HI~IIIlt 104.6 ac. Multi Family 2" ,..,.~ ,~ I~ l'-~' ~ 11 116.7 ac. Single Family 7~ 5o.s ac. Commercial L-:- ~;:,~ ~5.3 ac. ~~u~,/ 'City Park ~??~~! 167.9 ac. . TOTAL 766.1 0 400 8OO 1200 NORTH ,, SANDY LAKE ROAD date: february 1983 i r-~ ZONING MAP __ r~. o~,,~. Town Center ~ 218.4 ac. Town Home 2 i:::~:::1 ~.z Single F~ilyOIIIIIl~l~llll{ ~o~.~ ac. Multi Family 2~ .~.~ .c. Single Family 7~ ~o.~ ac. Commerc~a I[-----~+:~;-~ 15.3 ac. 'City Park }~?~1 ~7.9 . TOTAL 766.1 0 400 800 1200 NORTH SANDY LAKE ROAD date: february 1983 ,..;_& i-~ · ; ................. ZONING MAP Town Center ~~~ 218 4 ac. Town Home 2 l+++~+. :l 92.7 ac. Single F~ily 0111111~1~1111~ 104.6 ac. Multi Family 2~ 116.7 ac. Single Family 7~ 5o.s a~. 'City Park J~?~?~l 167.9 ac. · TOTAL 766.1 0 400 800 1200 L.J, NOFITH _~,~,,~.~----x'~ ROAD SAN ¥ LAKE ~. date: february 1983 ~ TEXAS POWER & LIGHT COMPANY P. O. Box 819061 · Dallas, Texas 75381-9061 December 9, 1985 Mr. Wayne Ginn Ginn Inc., Consulting Engineers 16135 Preston Road - Suite 106 Dallas, TX 75248 Dear Mr. Ginn: In providing electrical service to the Coppell Town Center, Texas Power & Light Company is proposing to build an overhead line along Univest's east property line from Sandy Lake Road North. Then we will build a "temporary" line from Univest's east property line that will run west to the Coppell Town Center. Due to 1) Univest plans of having all electric supply lines within the development underground and 2) Univest not having thisdevelopment subdivided at this time, it is impractical to provide a permanent total underground system for the Town Center project. Univest has agreed to be responsible for future costs involvdd in working the Town Center into the underground system to serve their Parks of Coppell development. Since the overhead line from Univest east property line west to the Town Center is a temporary line, the City of Coppell is responsible for the removal cost of this line amounting to $2369. This amount can be paid before c~nstruction of this line begins or the City can be billed for the work. Attached is a print indicating the line that will be removed and the most likely future underground source for permanent service to the Town Center (the cost of which Univest will be responsible for). Please let me know your preference for the collection of the $2369. Should you have nay questions or need further assistance, feel free to call me at 888-1382. Sincerely, Glenn Fabian Engineering Technician GF:th Attachment. ,1 I;IVI.~I4).%' t~l~' TEX.4,~ I'TII, I'I'iE.~ El,~;("l'ffi(' ('().