Loading...
2013_0423CHECK ONE: IRRIGATION DOMESTIC FIRELINE BA=OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: Lo4p 't PWS I.D. # p LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY � Reduced Pressure Principle ❑ Pressure Vacuum Breaker '4k Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturers Model Number Serial Number J-W qq Ll Size f The above is certified to be true. Firm Name Certified Testa ' 0 Firm Add�r-e -s-s�� �� -BC�a# T No. Date - -= v 76, Gauge #1 /000VC>:Z Date last accuracy tested 2�— White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC -Cln Closed Tight ❑ Opened at Opened at nsid Tight ❑ Leaked ❑ n sid nsid RP -_,psI Leaked Did not Open ❑ Leaked ❑ Repairs and Materials Used Test Auer DC- Closed (• Closed Tight Opened at Opened at nsid Repair Tight RP sId 1-7 nsid nsid The above is certified to be true. Firm Name Certified Testa ' 0 Firm Add�r-e -s-s�� �� -BC�a# T No. Date - -= v 76, Gauge #1 /000VC>:Z Date last accuracy tested 2�— White - Customer's Copy Yellow - City Copy Pink - Tester's Copy