CF-TownC CHC-CS 850422 Maxim Engineers, Inc.
Geotechnical
Materials Testing
Consultants
April 22, 1985
City of Coppell
P.O. t~ox 478
Coppell, Texas 75019
Re: Coppell Town Center
Coppell, Texas
Gentlemen:
We at Maxim Engineers, Inc. wish to thank you for giving us the opportu-
nity to provide you with the materials inspection and testing services
during the construction phases of the above referenced project.
In order to assure that we have all the correct information on the pro-
ject, please complete the enclosed Authorization to Proceed form and
return it to us at your earliest convenience. Also enclosed is a check
list for your convenience in selecting services which are consistent
with the needs of the project.
Please do not hesitate to contact us if you have any questions or if you
need any additional information regarding our services.
Very truly yours,
MAXIM ENGINEERS, INC.
Walter S. McMullin
Vice President
WSM:kh
Enclosures
2342Fabens
RO. Box 59902
Dallas, Texas 75229
(214)247-7575
Project: City of Coppell
Coppell Town Center - Coppell, Texas
Page 2
The following check list will provide a convenient means of selecting services which are
consistent with the needs of the project.
I. STRUCTURAL FILLS/COMPACTION TESTING VI. STRUCTURAL STEEL
__ Materials Acceptance Tests __ Sampling and testing
__ Moisture-Density Relationship __ Shop
__ Field Density Tests __ Fabrication
__ On-site inspection __ Welding
__ Painting
__ Field
II. SUBGRADE, PREPARATION, BASE MATERIAL, __ Erection
TESTS AND INSPECTION __ Welding
Materials-Acceptance Tests __ Bolting
__ Moisture-Density Relationship __ Painting
__ Field Density Tests
__ On-site inspection VII. NONDESTRUCTIVE TESTING
__ Plant inspection __ Shop
__ Ultrasonic
__ Radiograghy
III. BITUMINOUS BASE AND SURFACE COURSES __ Magnetic Particles
__ Materials Acceptance Tests __ Penetrant
__ Mix Designs ____. Field
__ Batch-Plant Inspection __ Ultrasonic
Spreading and Paving Inspection
Radiography
Verification Tests
__ Magnetic Particles
Stability and Density
-- __ Penetrant
__ Asphalt content by extraction
__ Aggregate gradation of the mixture VIII. MASONRY
__ Asphalt Cement properties __ Product-Acceptance Tests
__ Field Density __ Placement and Grouting Inspection
__ Thickness __ Grouting
IV. CONCRETE IX. PIER VERIFICATION
__ Material-Acceptance Tests ____ Identify Bearing Strata only
__ Mix Designs
__ Batch Plant Inspection X. PIER INSPECTION
__ On-site Inspection __ Full time pier hole inspection to verify that the
__ Concrete consistency soil bearing strata and the penetration required
__ Placement by the design engineer are attained.
__ Reinforcing
__ Imbedded items XI. LIME STABILIZATION INSPECTION
__ Precast/Pretensioned Inspection __ Full time lime stabilization inspection and
__ Fabrication testing, including IAme Slurry Pressure Injection
__ Erection inspection.
__ Post-Tensioned Concrete Inspection
__ Quality and Uniformity Tests XII. ROOF INSPECTION
__ Slump
__ Air Content
__ Temperature XIII. OTHER TESTS, INSPECTIONS OR SPECIAL
__ Unit Weight INSTRUCTIONS
__ Compressive Strength
__ Flexural Strength
__ Cement
V. REINFORCING STEEL __ Fabrication
__ Placement
__ Welding
__ Tensile and Bend Tests
Approved By: Date:
Maxim Engineers Inc,
Maxim Engineers Inc. 2342 Fabens
Geotechnical P.O. Box 59902
Materials Testing Dallas, Texas 75229
Consultants (214) 247-7575
AUTHORIZATION TO PROCEED
MATERIALS INSPECTION AND TESTING
-Please complete and return to us at your earliest convenience-
General Information:
Date: Authorized by:
Project Owner:
( Name ) (Address) (Phone)
Project:
Location of Project:
Contractor:
Please furnish us with Plans and Specifications: [ ]Yes [ ]No
Estimated Construction Starting Date:
2. Distribution of Reports: (No. of Copies and Addresses):
3. ~flling Information:
Fees: [ ] Current Fee Schedule
[ ] Proposal
[ ] Other
Billing Address:
Signature of Client responsible for payment of work performed by MAXIM ENGINEERS, INC.
Client:
Signature: Date