Loading...
CF-TownC CHC-CS 850422 Maxim Engineers, Inc. Geotechnical Materials Testing Consultants April 22, 1985 City of Coppell P.O. t~ox 478 Coppell, Texas 75019 Re: Coppell Town Center Coppell, Texas Gentlemen: We at Maxim Engineers, Inc. wish to thank you for giving us the opportu- nity to provide you with the materials inspection and testing services during the construction phases of the above referenced project. In order to assure that we have all the correct information on the pro- ject, please complete the enclosed Authorization to Proceed form and return it to us at your earliest convenience. Also enclosed is a check list for your convenience in selecting services which are consistent with the needs of the project. Please do not hesitate to contact us if you have any questions or if you need any additional information regarding our services. Very truly yours, MAXIM ENGINEERS, INC. Walter S. McMullin Vice President WSM:kh Enclosures 2342Fabens RO. Box 59902 Dallas, Texas 75229 (214)247-7575 Project: City of Coppell Coppell Town Center - Coppell, Texas Page 2 The following check list will provide a convenient means of selecting services which are consistent with the needs of the project. I. STRUCTURAL FILLS/COMPACTION TESTING VI. STRUCTURAL STEEL __ Materials Acceptance Tests __ Sampling and testing __ Moisture-Density Relationship __ Shop __ Field Density Tests __ Fabrication __ On-site inspection __ Welding __ Painting __ Field II. SUBGRADE, PREPARATION, BASE MATERIAL, __ Erection TESTS AND INSPECTION __ Welding Materials-Acceptance Tests __ Bolting __ Moisture-Density Relationship __ Painting __ Field Density Tests __ On-site inspection VII. NONDESTRUCTIVE TESTING __ Plant inspection __ Shop __ Ultrasonic __ Radiograghy III. BITUMINOUS BASE AND SURFACE COURSES __ Magnetic Particles __ Materials Acceptance Tests __ Penetrant __ Mix Designs ____. Field __ Batch-Plant Inspection __ Ultrasonic Spreading and Paving Inspection Radiography Verification Tests __ Magnetic Particles Stability and Density -- __ Penetrant __ Asphalt content by extraction __ Aggregate gradation of the mixture VIII. MASONRY __ Asphalt Cement properties __ Product-Acceptance Tests __ Field Density __ Placement and Grouting Inspection __ Thickness __ Grouting IV. CONCRETE IX. PIER VERIFICATION __ Material-Acceptance Tests ____ Identify Bearing Strata only __ Mix Designs __ Batch Plant Inspection X. PIER INSPECTION __ On-site Inspection __ Full time pier hole inspection to verify that the __ Concrete consistency soil bearing strata and the penetration required __ Placement by the design engineer are attained. __ Reinforcing __ Imbedded items XI. LIME STABILIZATION INSPECTION __ Precast/Pretensioned Inspection __ Full time lime stabilization inspection and __ Fabrication testing, including IAme Slurry Pressure Injection __ Erection inspection. __ Post-Tensioned Concrete Inspection __ Quality and Uniformity Tests XII. ROOF INSPECTION __ Slump __ Air Content __ Temperature XIII. OTHER TESTS, INSPECTIONS OR SPECIAL __ Unit Weight INSTRUCTIONS __ Compressive Strength __ Flexural Strength __ Cement V. REINFORCING STEEL __ Fabrication __ Placement __ Welding __ Tensile and Bend Tests Approved By: Date: Maxim Engineers Inc, Maxim Engineers Inc. 2342 Fabens Geotechnical P.O. Box 59902 Materials Testing Dallas, Texas 75229 Consultants (214) 247-7575 AUTHORIZATION TO PROCEED MATERIALS INSPECTION AND TESTING -Please complete and return to us at your earliest convenience- General Information: Date: Authorized by: Project Owner: ( Name ) (Address) (Phone) Project: Location of Project: Contractor: Please furnish us with Plans and Specifications: [ ]Yes [ ]No Estimated Construction Starting Date: 2. Distribution of Reports: (No. of Copies and Addresses): 3. ~flling Information: Fees: [ ] Current Fee Schedule [ ] Proposal [ ] Other Billing Address: Signature of Client responsible for payment of work performed by MAXIM ENGINEERS, INC. Client: Signature: Date