CF-TownC CHC-CS 830201::::::::::::::::::::::::: Municipal and Park Sites Allocation of Construction Costs to City of Coppe11 MUNICIPAL SITE - Current Construction Dirt Work * Contract 4,863.77 c.y. Undercut & Refill $ 6,296.90 3,699.11 c.y. Site Work (Road) 4,808184 8,562.88 c.y. Subtotal $ 11,105.74 1. Pavement 1,383.71 s.y. 8" Concrete $ 19,316.59 @ $13.96 195.55 s.y. Brick Pavers 8,506.66 @ $43.50 s.y. 1,749.83 s.y. 6" Lime Prep. 1,662.34 @ $0.95 24.49 tons Lime 1}836.75 @ $75.00 Subtotal $ 31,322.34 2. .~:~' Sanitary Sewer 554.64 1.f. 8" Pipe $ 5,158.15 ~ $9.30 1 @ $1,700 4' Dim. MR 1,700.00 Subtotal $ 3,429.07 3. TOTAL MUNICIPAL SITE $ 45}857.15 PARK SITE - Current Construction Dirt Work (Embankment for Road) 7,669.55 c.y. $ 9,970.42 l. @ $l.3o Sanitary Sewer 550 1.f. 8" Pipe $ 5,115.00 @ $9.30 2 @ $1,700 4' HR 3,400.00 Subtotal $ 4,257.50 3. ' ,~ ~ ' Storm Sewer 202.5 l.f. 18" RCP $ 3,240.00 ~ $16.00 1 @ $1,200 Concrete MDWL 1,200.00 3. 6' Curb Inlet ..... ~i'~IF.~CH~IBIT~A- Continued W;'" 6 - 8 X 8 8 X 8 ~x Culverts $ 17,857.50 ~' (1/6 coat) (1/4 cost) Box Culverts lt125.00 Excavation Subtotal $ 23tA22.50 Miscellaneous Fill and Grading Channel (Tr. 22, 23 $ 2,486.25 and 9) Contract Price Channel 3,100.00 Subtotal $ 5~586.25 5. TOTAL PAR~SITg $ 43~236.67 TOTAL CURRENT CONSTRUCTION PER CONTRACTS Municipal Site $ 45,857.15 Park Site 43t236.67 Subtotal $ 89~093.82 CONSTRUCTION OVERHEAD - ENGINEERING AND FEES CHUD Fees - Estimate Municipal Site ($50,000 x 3.12%) $1,560.00 Park Site ($50,000 x 2.95I) 1~475.00 Total CHUD Fees $ 3,035.00 3. ' Engineering (Baaed on above costs) Current Municipal Site ($45,857.15 x 5%) 2,292.86 Park Site ($43,236.67 x 5%) 2,161.83 Subtotal $ 4,454.69 1,2,4 TOTAL COST $ 96,583.51 *1. Contract between The Parka of Coppell Joint Venture II and V. W, Stephens and Associates~ Inc, dated July 101 1983 for roadway embankment york, 2, Contract between The Parka of Coppell Joint Venture and The Parks of Coppell Joint Venture II and Austin Paving Company dated August 31~ 1983 for roadway paving, 3, Contract between Coppell Municipal Utility District I and Lanzo Construction Company dated for watert sanitary sewer, and storm ae~er installation, 4. Contract between The Parks oi Coppell Joint Venture an~ Coppell Construction Company datedSuly 28, 1983 for construction of box culverts. 5. Contract between The Parka of Coppell Joint Venture II and V. W. Stephens and Associates, Inc. dated May 4, 1983 for miscellaneous channel excavation. (e) The City will have agreed to accept water detention areas as shown on the master drainage plan for maintenance purposes. ARTICLE V ADDITIONAL AGREEMENTS In consideration of the mutual undertakings set out in this Article V, and as additional consideration for the purchase and sale of the Municipal Center Site and said Phase I, and the granting of the options referenced in Article II above, Owner and City covenant and agree as follows, it being understood that such covenants and agreements are normal and reasonable provisions in light of all the circumstances: 1. The City shall pay its pro rata share of all utilities, paving, culverts, bridges, drainage, and other actual costs of improvements constructed adjacent to or that benefit the Municipal Center Site or Park Site. Attached as Exhibit "E' is a preliminary estimate by Threadgill-Dowdy & Associates, Inc., consulting engineers, of City's pro rata (see items A, C and D thereof) share of Parkway Boulevard adjacent to the Municipal Center Site, it being agreed that actual costs may vary substantially from Exhibit E. City's pro rata share shall be payable within fifteen (15) days after certification from Owner's engineer that all such improvements or parts thereof have been completed to the standards of the City of Coppell or construction draws have been appropriately certified. Owner agrees that City may construct the north one-half of Parkway Boulevard adjacent to the Park Site subsequent to Owner's construction of the South one-half of Parkway Boulevard, and City agrees to complete construction of the North one-half of Parkway Blvd. no later than three (3) years following closing. Ail street rights-of-way around the perimeter of such sites shall be located one-half on such sites. The City shall dedicate such rights-of-way on or before the written request of Owner to City. 2. The City will not unreasonably deny permits requested by Owner for the burning of vegetation, brush, and trees cleared from the Property. 3. In areas of the Property zoned Multi-Family 2 in accordance with the Zoning Plan, a courtyard area and swimming pool for the private use of the occupants of those projects will be provided: 4. A merchants' association with agreement of Owner, shall maintain any landscaping adjacent to the proposed Main Street as shown on the Zoning Plan for a period of ten (10) years after construction of Main Street commences~ provided that such area shall be dedicated to the publi¢~ that the City will make water for such maintenance purposes available free of any and all charges, cost or expense, and that the City will be responsible for maintenance after such ten (10) year period~ 5. If the City should ever act to dissolve or acquire the assets of the Coppell Municipal Utility District No. 1 ("CMUD"), it will assume and make payment, at maturity, of any outstanding Bond Anticipation Notes issued to Owner by such utility district and honor any -5- EXHIBIT B Date, shall convey or cause such portions of the Property to be conveyed to City, and all or part of the aforesaid purchase prices, at Owner's option, shall be applied in connection with such deferred exchange to acquire the Exchange Property on such basis as Owner may direct. 8. City acknowledges that the Park Site and Municipal Center Site are being acquired in an undeveloped status and are within the 100 year Flood Plain as established by the Federal Emergency Management Agency and/or the U.S. Corp of Engineers and are subject to inundation of water from time to time. City agrees to use all excavation material from the Park Site (except marketable gravel deposits) first for filling areas of the Park Site and Municipal Center Site as designated by Owner from time to time. Owner shall have the right to select in its sole discretion the method of future flood control to be utilized on the Property (whether by fill, levee system, or a combination thereof or any other feasible method) and City agrees that its flood control method employed for the Park Site and Municipal Center Site shall be consistent with the method used for the Property as determined by Owner. .. . ~------------ --~ 9. Owner agrees toC~uct Parkway Boule~ from Denton Tap Road to Heartz Road, and to commence such construction within one {1) year of Closing. 10. City agrees to build, at its cost, a sixteen inch (16") water line along the east side of Denton Tap Road from Sandy Lake Road to Parkway Boulevard to provide water service to the Park Site and Municipal Center Site, and City agrees to complete construction of such water line prior to Owner's completion of utilities to be constructed in Parkway Boulevard as required by paragraph 9 immediately above. A preliminary estimate of the cost of such water line is set forth in item B of Exhibit E attached hereto. ARTICLE VI SURVEYS The Owner has delivered to City, at its cost, perimeter surveys of the Municipal Cemter Site and Phases I, and III of the Park Site. Such surveys, which are acceptable to City, state the gross number of square feet in the Municipal Center Site and the gross number of acres in each of Phase I, II and II! of the Park Site, including certain areas to be dedicated by the City as rights-of-way pursuant to Article V above. If the closing of the purchase of such sites' fails to occur for any reason, the City shall promptly reimburse Owner for the cost of such surveys. ARTICLE VII MODIFICATION OF LIENS The obligation of Owner to consummate this Agreement is expressly subject to Owner obtaining modifications of the release provisions contained in the Deeds of Trust affecting the Municipal Center Site and Park Site satisfactory to it in order that it can convey such sites in accordance with this Agreement. Owner shall use all reasonable effort to obtain such modifications. -7- THREADGII. I.-DowDEY & ASSOCIATES C:ONSULT lNG ENGINEERS INSUflANCE LANE 12%4) S26-5273 DALLAS. TEXAS ?.~20R October 28, 1982 Mr. Mike Allen Univest Corporation 6350 LBJ Freeway, Suite 228 Dallas, lexas, 75240 Re: The Parks of Coppell City Participatior, Dear Mike: Enclosed'i.s a tabulation of the estimated development cost connected with the proposed Municipal Center and a sketch relating the same items. I hope this data will be helpful to you. Very truly yours, THREADG]LL-DOWDFY & ASSOCIATFS D?~D/d.) I EXHIBIT C PROP. STORM SEWER PROP 12' PROP. I0" SANI, SEWER '?'' wATER _z UNICIPAL ,,. CENT ER" THE PARKS O COPPELL SANDY LAKE ROAD SCHEMATIC SKETCH MUNICIPAL. CENTER COPPELL , TEXAS OC-'fOPER , 19P. 2 r,'O FC,~I.E THE PARKS OF COPPELL EST]HAI'ED CITY PARTICIPATION DEVELOPI.1ENT COST PROPOSED MUNICIPAL C£NTER A. ]TMES ADJACENT TO MUNICIPAL CENTER S]T£ 1. PAVING- PARKWAY BOULEVARD (22, F-F Cone:ere) 1,420 S.Y. 6" Conc. ~ S !5.00 : $21,30.r.CC: 1,500 S.Y. - Lime SubgraOe 0 2.50 1,100 L.F. 6" Curbs (~ 2.OO -- Gradino - 600 C.Y. Fill (e 2.50 2. SANITARY SEWER (ESTINATED lO" 555 L.F. - 10" Sewer Pipe ~ .~ 10.OO 1 Ea. 4' Dia. Manhole (~ 1250.00 -- 40 C.Y. Rock Embedn~nt (~ 20.00 : 6[:[ .Or,, L.S. Hist. (~ 500.00 : 5C:~. TOTAL ~ t ,T'G~T: OO CITY PART - 50,: 555 L.F. 16" Water (~ .~ 1E.OO : 1 Ea. 16" Valve ~: 22C0.00 = 2,20C'.rj0 0.2 Tons Fittings ~ 1800.00 = 36C.C0 L.S. Misc. ? 503.00 = 5OS.OC TOIAL S 13 ,O50. OC; CITY PART - 50% = S 6,52-L..0S 4. STORM SEWER (ESTIMATED 36" DIAMETER) 555 L.F. 36" R.C.P. 6 S 40.00 : S22,200.O0 1 Ea. - lO' Curb ]nie; ~ 1500.00 .: i,500.DO 90 C.Y. - Sand Embedlnent (~ 10.00 = 90,S.OS TOTAL S2~, 600. CITY PART - ~'r',..~: = ~,.',J...O,, E,. iG" WATER LINE - DEl;TON TAP ROAD 2,650 L.F. 16" Water 6 ~. IB.00 3 Ea. 16" Valves Co 2200.00 0.5 Tons - Fittin§s 6' lt;0[,.00 : 90[.. 05' 1OO L.F. Bore, Case & Furnish 12" Water Pipe ~ .~C:.O0 1 Ea. - 12" Valve 6' 7C0.00 : 70~.OC, 200 C.Y. - Sand Embedment e IO.O0 : 2,00~.00 4 Ea. - 1 I/2" Blow-Off Assemblies (~ 2'30.00 ~ 1,OOO.OD TOTAL "'" .'~ ,9O.q. OD C. CHARGES FOR MUHICIPAL UTILITY DISTRICT lOt of Eligible Construction Cost (sgo,~7~) - S~,OOC.O0 D. E~(GINEERING COST 10C of Total Construction Cost (Sl19,525) " S12,00G.OG SU.~I~ARY OF ESTIMATED COST 1. PAV)NG (PARK~:AY BLVD.) · $28,750.00 2. SANITARY SEWER ( PARKWAY BL~fD.) ~ 4,050.00 3. 16" ~JATER LINE ( PARKWAY BLVD ) - 6.525.00 4. SIOI~M SEWER (PARKWAY BLVD. ) ~ 12,300.00 5. 1G" WATER (DE)~TOll lAP ROAD ) -- · 67,900.QD 6. Iq,.U.D. CHARGES ~ .c,O00.O0 7. EltGI N'E~I NG ~ I~,DOD.DD TOTAL S 14 0,525. O0