Loading...
2013_0905 (4)CIIECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: A C I, The baci low prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacuum Breaker ❑ Double Check Valve C Atmosphere Vacuum Breaker Manufacturer T�f'i? I Size Model Number %° Located At Serial Number The above is certified to be true. Firm Name COQ Ivi Firm Addcess T7 760 9 5 Gauge # Date last accuracy tested Certified Tester -Te r r44 Cert. Tester No.)MrQ Y66,9 Date -' White — Customer's Copy Yellow — City Copy Pink — Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight o Opened at Opened at vsid Tight, f El RP -nsid Leaked ❑ nsid vSid Lea;ed ❑ Did not Open ❑ Leaked ❑ Reps and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at nsid Repair Tight ❑ nSid vSid RP sid The above is certified to be true. Firm Name COQ Ivi Firm Addcess T7 760 9 5 Gauge # Date last accuracy tested Certified Tester -Te r r44 Cert. Tester No.)MrQ Y66,9 Date -' White — Customer's Copy Yellow — City Copy Pink — Tester's Copy