Loading...
2013_0906 (11)CIIECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE:; !� - i1r 14 b 14 The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. C Manufacturer Model Number Reduced Pressure Principle Double Check Valve Serial Number TYPE OF ASSEMBLY ❑ Pressure Vacuum Breaker C Atmosphere Vacuum Breaker Size Located At J /", The above is certified to be true. Firm Name 1 J27 Y � r, 0,0-71A'9 Firm Address r,1/ Gauge # Date last accuracy tested //' //0 / Certified Tester` G Y Cert. Tester No.. G Date White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight ❑ Opened at Opened at osid Tight Z' RP- �)„psid Leaked ❑ Leaked 13 osid osid Did not Open ❑ Leaked ❑ Reps and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at osid Repair Tight ❑ nsid osid RP sid The above is certified to be true. Firm Name 1 J27 Y � r, 0,0-71A'9 Firm Address r,1/ Gauge # Date last accuracy tested //' //0 / Certified Tester` G Y Cert. Tester No.. G Date White - Customer's Copy Yellow - City Copy Pink - Tester's Copy