WA9302A-CS 970523 SHIMEK, JACOBS & FINKLEA, L.L.P.
CONSULTING ENGINEERS
8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900
ROSS L. JACOBS, P.E.
RONALD V. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE n. CARTEn, P.E. May 23, 1997
GARY C. HENDRICKS, P,E.
I. C. FINKLEA, P.E.
Mr. Matt Cast
Superi ndent of Public Services
City Coppell
Pos ffice Box 478
C pell, Texas 75019
kway Pump Station Addition
SCADA System Operation and Maintenance Manuals
Dear Mr. Cast: 14~
and~ shop drawings for the
We are delivering six sets of operation and maintenance manuals f final
SCADA System installed under the construction contract for the Vi Parkway Pump Station Addition
Project. The manuals and shop drawings were submitted by GE Team Controls, Inc.
We have reviewed the information contained in these submittals and find that they are in general conformante
with the requirements of the contract documents.
These sets are provided for the City's use and records. Although we have retained one copy of the shop
drawings submitted by the contractor on this project for our records, we have not kept a copy of the operation
and maintenance manuals.
We are available to discuss this project further at your convenience.
Sincerel o , ~' ~.J
cEc~c~rry Davis
JAcoppellX94156XSCADA_om.doc