Loading...
CF-Justice Center-PL 970318DATE: TO: FROM: RE: COPPELL ENGINEERING UTILITIES DIVISION 1MEMORANDUM 3/18/97 Larry Davis, Construction Inspector Larry Smith, Utilities Walk thru for City of Coppell Courts Building on Town ~nter Blv~l, A walk-thru on the above referenced project was conducted on 3/19/97 and the items below were found to be deficient. 1. This Contractor has work to do on both vaults in front of l~uil0ing I have set up about 4 or 5 different meeting to go over what is needled to pass, 3. I can't get them to come to any of the meetings. I am letting you know because 4. I don't know what else tO do, 5. They have a temporary C.O. to open every ~inc¢ the temp, Co, I can't get any COOl. ration, 10. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg