Larry Davis, Construction Inspector
Larry Smith, Utilities
Walk thru for City of Coppell Courts Building on Town ~nter Blv~l,
A walk-thru on the above referenced project was conducted on 3/19/97
and the items below were found to be deficient.
1. This Contractor has work to do on both vaults in front of l~uil0ing
I have set up about 4 or 5 different meeting to go over what is needled to pass,
3. I can't get them to come to any of the meetings. I am letting you know because
4. I don't know what else tO do,
5. They have a temporary C.O. to open every ~inc¢ the temp, Co,
I can't get any COOl. ration,
10.
Please ensure that these items get taken care of and if you have any questions, please