CF-Justice Center-PL 9702110~/11/97
February 11, t997
16:o~
COI~q~-LL ~TG~G
U'T~rl'I~ D~!SZON
M~ORANDU~
TO: Larry Davis
lrROM: Larry Smith, Utilities
Walk thru for coppel,! Crimjna, 1 Cour~,,s, Buildin9
A wn.!~-thru or: the above t'eference, d project was ¢onductexl on __
and thc ia:ma below were found to be de."icient.
1. Need support under pipe in both vaults.
2/11/97
001
Need back flow test result on both double check valves.
5
5
Pleas~ ¢nam that these items Set tnk~ ¢a~ of and if ~au haw mn7 questions, plea.~
~iv~ mo a call.