Loading...
2013_0411 (26)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACMOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. ❑ Reduced Pressure Principle O Double Check Valve Manufacturer C r Model Number Serial Number (� o o 1 g a TYPE OF ASSEMBLY ❑ Pressure Vacuum Breaker C Atmosphere Vacuum Breaker Size i /Z)- Located At �'\ S, (- K r`,V\ The above is certified to be true. Firm Name T t ` f Firm Address Gauge # -a ? n Date last accuracy tested Vi U % 16-1 Certified Tester I � ( Cert. Tester No. S�Y)o I' Date White — Customer's Copy Yellow — City Copy Pink — Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight ❑ Opened at Opened at nsid c= , Tight ❑ R.P -_psid Leaked ❑ nSid nSid Leaked ❑ Did not Open ❑ Leaked ❑ Reps and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at osid Repair Tight ❑ nsid oSid RP sid The above is certified to be true. Firm Name T t ` f Firm Address Gauge # -a ? n Date last accuracy tested Vi U % 16-1 Certified Tester I � ( Cert. Tester No. S�Y)o I' Date White — Customer's Copy Yellow — City Copy Pink — Tester's Copy