Loading...
2013_0905CIIECK ONE: IRRIGATION DOMESTIC FIRELINE BACIU'LOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # LOCATION OF SERVICE: n Mo(.Xk,rcib {Y-4 The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. ❑ Reduced Pressure Principle Double Check Valve Manufacturer deb e,G Model Number Serial Number H E) TYPE OF ASSEMBLY o Pressure Vacuum Breaker C Atmosphere Vacuum Breaker Size Located At 1- ra 0� sc ica C4/, The above is certified to be true. Firm Name I (�� Certified Tester Firm Address � t✓ Cem Tester No. Gauge # 7,5 U)Q Date last accuracy tested Dam y I S /3 White — Customer's Copy Yellow — City Copy Pink — Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check- _ _ 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight 'F, Opened at Opened at psid Tight .D RP —_psid Leaked ❑ Leaked o psid osid Did not Open ❑ Leaked o Reps and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at osid Repair Tight ❑ psid psid RP sid The above is certified to be true. Firm Name I (�� Certified Tester Firm Address � t✓ Cem Tester No. Gauge # 7,5 U)Q Date last accuracy tested Dam y I S /3 White — Customer's Copy Yellow — City Copy Pink — Tester's Copy