Loading...
2013_0122 (32)CHECK ONE: IRRIGATION DOMESTIC FIRELINE A BACIGLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE: The bad -Low prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. ❑ Reduced Pressure Principle -a Double Check Valve PRESSURE VACUUM BREAKER Double Check Valve Assembly Manufacturer Model Number' Serial Number 2nd Check: TYPE OF ASSEMBLY C Pressure Vacuum Breaker ❑ Atmosphere Vacuum Breaker Size QQ Located At The above is certified to be true. Firm Name X22 =�' /. Certified Tester Firm Address C-rj rl"64 Tic -7 5-43 410 Cert. Tester No. 6 10-17 3 Dente r k Q 5-° l 3 Gauge # 3 7 2 3 53 Date last accuracy tested /, -�l a - /3 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight X� Opened at Opened at psid Tight 0 Leaked ❑ Leaked ❑ osid nsid Did not Open ❑ Leaked ❑ Repairs and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at __psid Repair Tight ❑ nsid psid RP sid The above is certified to be true. Firm Name X22 =�' /. Certified Tester Firm Address C-rj rl"64 Tic -7 5-43 410 Cert. Tester No. 6 10-17 3 Dente r k Q 5-° l 3 Gauge # 3 7 2 3 53 Date last accuracy tested /, -�l a - /3 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy