Loading...
Coppell Greens 1-CS 981112 (2) m ARGUS DEVELOPMENT COMPANY November 12, 1998 Mr. Garreth Campbell City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Dear Mr. Campbell: As per your telephone conversation of today with Preston Skaggs of Alton Lloyd, Inc. regarding the completion of the sidewalks and the channel areas in Coppell Greens Phase 1, please let thi.q letter serve as our commitment to continue working on these areas until they are completed. The completion time will vary depending on the weather and final results may vary slightly due to filed modifications, but completion should be in early December of 1998. Also, Coppell Greens, Ltd. agrees to provide a looped waterline connection to Denton Tap Road for the subdivision once the City of Coppell has provided the connection on the west side of Denton Tap as shown on the approved plan.~ for the subdivision. The connection will be made according to the plans and specifications approved by the City, provided however, that we are either in the process of developing Phase 2 or will be developing Phase 2 in the near future. If the City has not provided the connection within three (3) years from the date of this letter, the City agrees to automatically release Coppell Greens, Ltd. from this liability If you require anything further, you may reach me at 505-889-3061. Sincerely, Coppdl Greens, Ltd.  ent Company of Texas, inc. ski UPT()WN BLVD NE SUITE 5 lO-W · ALBUQUERQUE. NEW }:AX 505- 837- 1061 MEXICO 871 I0 November 18, 1998 Garreth Campbell City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 ARGUS DEVELOPMENT COPPELL GREENS PHASE I Dear Garreth: Pursuant to our walk through today, following is the list of things Argus Development agrees to install for erosion and sedimentation control: 1. On the North side of the lake, Argus will remove inlet protection covers and install curlex along both side of the road, around lake area and along street that proceeds north word directly across l~om the lake. 2. Southern entranceway, the first cul de sac on the left, Argus will install silt fence around entire cul de sac and seed right of way l~om curb 10 feet back. 3. Second cul de sac on left, Argus will install additional silt fence on western side and at swale will install load of crashed stone to act as filter mechanism to trap loose sediment. On eastern side ofcul de sac, Argus will install curlex containing a seed mixture to facilitate vegetative growth. All erosion control measures will be installed within the next 7-10 days. Sincerely, Elvio Bruni