Loading...
Coppell Greens 1-CS 981001 (2)/The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 .., EILE P.O. Box 478 Coppell, Texas 75019 972-462-0022 October 1, 1998 Lori Allen Eastern Development Companies 5225 Village Creek Dr., Suite 400 Plano, Texas 75093 Dear Ms. Allen: The following assessment represents the number of light units as established by CoServ Electric for Coppell Greens, Phase I: 10 lights @ $292.60 per light -' $2926.00 Prior to the final acceptance of this project, a check in the amount of $2926.00 should be made payable to the City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a copy of the street light fee assessment list. Please provide a copy of your paid receipt to our office so that we will be able to verify payment of the required fees and assure a successful completion of this project. If you should have any questions please feel free to contact me at your convenience. Sincerely ¢ . Kenneth M. Griffin, P.E. Director of Engineering and Public Works CC: Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Glenn Hollowell P.E., Asst. Dir. of Public Works Devlpfeedcplgr~.doe 10/0!/98 11:53 ~940/~1 6640 CoServ Electrlc~ ~0002/0002 An Ajfllia~¢ of Denton County El~ct~c ~ Eieet~ 3501 FM 2181 Corinth, ~ 762~ Metro 817-430-1195 800-274~14 REQUEST FOR STREET LIGHTING FACILITIES DENTON COUNTY ELECTRIC COOPERATIVE, INC. of:. coPP=u.. Size Type Pole Install Watts Remove 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 150 HPS Antq Install 'Location Kilbridge Ln L 17 BIk C Kilbridge Ln L 08 Blk C Kilbridge Ln L 05 BIk B Kilbridge Ln L 16 Bik B Tumberry Ln L 32-33 BIk C Tumberry Ln L 01 BIk C Tumbemj Ln L 12-13 BIk B Fallkirk Ct L 02-03 BIk B Fallkirk Ct L 05 BIk A Applecross Ct L 16-17 Blk A Type - MV=Mercury Vapor, MH=Metal Halide, HPS--High Pressure Sodium, Pole-W-'-Wood, S--Steel, FG=Fiberglass Antq=Antique Requiremenis/Instmctions: ..~)PPELL GREENS PHASE t Estimated cost for 36 months $2934.00 10 lighls ~l) $ 8.15 q~r month per lieht location 10 x $l~.l~x 36 months =$ 2934.00 Electric Sen/ice is to be provided and billed according to the provision of the Coopemtive's Tariff for electric service. Work Order~ 980342 Requested by Service Order8 Date March 27, 1998