Coppell Greens 1-CS 981001 (2)/The City With A Beautiful Future
P.O. BOX 478
COPPELL, TEXAS 75019
.., EILE
P.O. Box 478
Coppell, Texas 75019
972-462-0022
October 1, 1998
Lori Allen
Eastern Development Companies
5225 Village Creek Dr., Suite 400
Plano, Texas 75093
Dear Ms. Allen:
The following assessment represents the number of light units as established by CoServ Electric for
Coppell Greens, Phase I:
10 lights @ $292.60 per light -' $2926.00
Prior to the final acceptance of this project, a check in the amount of $2926.00 should be made
payable to the City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a
copy of the street light fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be able to verify payment of
the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your convenience.
Sincerely
¢ .
Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
CC:
Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Glenn Hollowell P.E., Asst. Dir. of Public Works
Devlpfeedcplgr~.doe
10/0!/98 11:53 ~940/~1 6640 CoServ Electrlc~ ~0002/0002
An Ajfllia~¢ of Denton County El~ct~c
~ Eieet~
3501 FM 2181
Corinth, ~ 762~
Metro 817-430-1195
800-274~14
REQUEST FOR STREET LIGHTING FACILITIES
DENTON COUNTY ELECTRIC COOPERATIVE, INC.
of:. coPP=u..
Size Type Pole Install
Watts Remove
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
150 HPS Antq Install
'Location
Kilbridge Ln L 17 BIk C
Kilbridge Ln L 08 Blk C
Kilbridge Ln L 05 BIk B
Kilbridge Ln L 16 Bik B
Tumberry Ln L 32-33 BIk C
Tumberry Ln L 01 BIk C
Tumbemj Ln L 12-13 BIk B
Fallkirk Ct L 02-03 BIk B
Fallkirk Ct L 05 BIk A
Applecross Ct L 16-17 Blk A
Type - MV=Mercury Vapor, MH=Metal Halide, HPS--High Pressure Sodium,
Pole-W-'-Wood, S--Steel, FG=Fiberglass Antq=Antique
Requiremenis/Instmctions: ..~)PPELL GREENS PHASE t
Estimated cost for 36 months $2934.00
10 lighls ~l) $ 8.15 q~r month per lieht location 10 x $l~.l~x 36 months =$ 2934.00
Electric Sen/ice is to be provided and billed according to the provision of the Coopemtive's Tariff
for electric service.
Work Order~ 980342
Requested by
Service Order8
Date March 27, 1998