Loading...
2013_0716 (2)CIIECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE; The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY e Reduced Pressure Principle C Pressure Vacuum Breaker C Double Check Valve C, Atmosphere Vacuum Breaker Manufacturer 41'1 iii /1/. l I? -� Size Model Number 7 �� �L Located At Scrial Number 3 ?� % The above is certified to be true. Firm Name .O &1 YD C0121172 Certified Tester 3 6? Firm Address '`, d - V" A L: Cat. Tester No. d PzZ nl�/ ! "� Date -) /- �G�vgC/ Gauge # C 'SAD 20 ors a Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight C Opened at Opened at nSid Tight �J�S ❑ Leaked C nsid nSid RP -_psid Leaked C Did not Open D Leaked C Reps and Materials Used Test After DC- Closed Closed Tight C Opened at Opened at nSid Repair Tight 0 nsid nSid RP sid The above is certified to be true. Firm Name .O &1 YD C0121172 Certified Tester 3 6? Firm Address '`, d - V" A L: Cat. Tester No. d PzZ nl�/ ! "� Date -) /- �G�vgC/ Gauge # C 'SAD 20 ors a Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy