Loading...
Coppell Greens 1-CS 980825PK No.: 1905-98.~i~-' Mr. Ken Griffin CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Re: HIGHPOI~'" Lewi~ifre, Texas Dear Ken: Enclosed for you to review is one set of civil engineering construction plans for the referenced project prepared by Pacheco Koch. These plans have been submitted to the City of Lewisville for final approval and we expect to begin construction in early October. Specific reference is made to the discharge of the stormwater from our site to "The Greens" residential project located immediately to our south. We are indicating a discharge of approximately 205 CFS onto the Greens Property. We believe, based upon our review of the Greens drainage area map, that this discharge is anticipated by their development. Please note that our initial phase includes only the development of the major site infrastructure and does not include the detailed site design of the project immediately north of the Greens. During the initial phase, storm water will be discharge onto the Greens Project in a unconcentrated, generally sheet flow method. Upon development of the site immediately north of the Greens Project, stormwater discharge will be collected in an underground storm sewer system and discharged onto the Greens Property. As we discussed, at that time we will make modifications to reduce velocities to §-feet per second or less to reduce erosion at the discharge point onto the Greens Property. JAK/lar 1905-35 enc. Please review these plans and contact us with any questions you have. If you have no comments, please furnish us with a letter approving of this first phase of the project. If you desire, we will submit plans for the site immediately north of the Greens Project upon development of that project. ch, Jr., P.E. CC: T.S. Kumar - City of Lewisville Subash Gaitonde - CMC Construction Hardy McCullah - Hardy McCullah/MLM Architects, Inc.