Loading...
2013_0708 (3)CHEC K ONE.. IRRIGATION X DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: Lii 17 1 -212 PWS I.D. 9 lLXAS I er 1.14i -t t� r� ri LOCATION OF SERVICE: S -4 Zoo The backllow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacuum Breaker J Double Check Valve C Atmosphere Vacuum Breaker Manufacturer ��hC6 size 26� y Model Number 656 Located At zVmli, In it f4 Serial Number C.C�4 44/ The above is certified to be true. Firm Name &J t�Far- RoS Firm Address L d9z III!7 ( )a)C41LtczC.V1 to TjC Gauge # Ofv 116015 Date last accuracy tested __.. q 5 2 Certified Tester JaS60 4(-),STco 0 Cert. Tester No. ao-X) G S 1 Date 46LL White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUTJM BREAKER Double Check Valve Assembly 1st Check 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight Closed Tight Leaked C ' � 9 Opened at pSid Opened at _osid nsid Leaked Did not Open C Leaked O Repairs and Materials Used Test After DC- Closed Closed Tight o Opened at Opened at _ tinsid Repair Tight ® psid Sid RP sid The above is certified to be true. Firm Name &J t�Far- RoS Firm Address L d9z III!7 ( )a)C41LtczC.V1 to TjC Gauge # Ofv 116015 Date last accuracy tested __.. q 5 2 Certified Tester JaS60 4(-),STco 0 Cert. Tester No. ao-X) G S 1 Date 46LL White - Customer's Copy Yellow - City Copy Pink - Tester's Copy