Loading...
2013_1105CHECK ONE: IRRIGATION_ DOMESTIC FIRELINE BACKFLOW PREV.— E-NMO-(N iEMMLY TEST AND MAINTENANCE REPORT NAME OF PWS: t PWS I.D. LOCATION OF SERVICE: The bacldlow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker JO Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturer Size z �± Model Number Q s�Q Located At S C . G r-r i er O �°- Serial Number'" The above is certified to be true. Firm Name Cng3 Certified Tester Firm Address Cent Tester No. Date Gauge # 25S6a0 Date last accuracy tested 15 L White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly Relief Valve Air Inlet Check Valve 1st Check , 2nd Check �, Initial Test DC-CIosed Closed Tight Opened at Opened at nsid R� Tight )Q RP -_ -psid Leaked ❑ nsid usid Leaked ❑ Did not Open ❑ Leaked ❑ Repairs and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at ____psid Repair Tight ❑ ,nsid sid RP sid The above is certified to be true. Firm Name Cng3 Certified Tester Firm Address Cent Tester No. Date Gauge # 25S6a0 Date last accuracy tested 15 L White - Customer's Copy Yellow - City Copy Pink - Tester's Copy