Loading...
Coppell Greens 1-CS 980219William A. Anderson, P.E. Dowdey Anderson & Associates 5225 Village Creek Dr. Piano, TX 75093 P.O, Box 478 Coppell, Texas 75019 972-462-0022 February 19, 1998 CoppeH Greens, Phase 1 Development Fee Assessment Dear Mr Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $338,044.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Director of Engineering & Public Works CC: Jennifer Armstrong, Fioance Director Doug Stevens, Engineering Technician Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Date: Coppell Greens, Phase 1 2/19/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $62,100.00 $62,100.00 (100% due prior to Council Approval) Water Tap Inspection Fee $6,200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,896.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Irrigation) $455.86 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $4,200.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Irrigation) $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $54,000.00 $54,000.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $6,000.00 (100 % due at Issuance of Building Permit) Utility Final Inspection Fee $6,000.00 (100% due at Issuance of Building Permit) Park Fee $154,200.00 $154,200.00 (100% due prior to Council Approval) Roadway Impact Fee $67,744.00 - $67,744.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $363,460.80 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $338,044.00 * See Roadway Impact Fee Worksheet DEVELOPMENT FEE WORKSHEET PROJECT: CoppeE Greens, Pt~e I DATE: 2/19/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 120 - 5/8 inch X 3/4 inch = 120 ESU's 2 - I inch = 5 ESU's I - I 1/2 inch -- 5 ESU's I - 2 inch -- 8 ESU's Total #: 138 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection 1;ee: Total #: 124 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 120 Domestic Meter(s) @ $24.14 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (lrrigation/Fireline): Total #: 2 Irrigation Meter(s) @ Total #: I Additional Irrigation Meter(s) @ Total #: I Additional Irrigation Meter(s) @ (100% due prior to issuance of water meters) $57.75 $144.38 $195.98 Water Meter Deposit Fee (Domestic): Total #: 120 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Water Meter Deposit Fee (Irrigation): Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 120 $450.00 ea. Wastewater Tap Inspection Fee: Total #: 120 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 120 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $62,100.00 $6,200.00 $2,896.80 $115.50 $144.38 $195.98 $4,200.00 20.00 $54,000.00 $6,000.00 $6,000.00 Page 3 DEVELOPMENT FEE WORKSHEEr Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: 120 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A 54,200.00 N/A * $64,744.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) * See Roadway Impact Fee Worksheet Need submittal of development contracts Page 4 ROAb WAY IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Greens, Phase 1 2/19/98 ROADWAY IMPACT FEE: iService Area * Category ** Land Use ** Buildin~ Size (ScI. Ft.) Development Units ** Sil~e-Fami¥ Detacl~l N/A Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due -- (Development Units) x (Vehicle Miles ~r Development Uni0 x (Fee per Vehicle Mile) -- 120 2.85 $300 $102,600.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Credit of $37,856.00 as per the development agreement I,2 / s.~. x ~,s2~ s.~. = ,3~,~s~.oo~