Coppell Greens 1-CS 980219William A. Anderson, P.E.
Dowdey Anderson & Associates
5225 Village Creek Dr.
Piano, TX 75093
P.O, Box 478
Coppell, Texas 75019
972-462-0022
February 19, 1998
CoppeH Greens, Phase 1
Development Fee Assessment
Dear Mr Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $338,044.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Director of Engineering & Public Works
CC:
Jennifer Armstrong, Fioance Director
Doug Stevens, Engineering Technician
Public Works
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project:
Date:
Coppell Greens, Phase 1
2/19/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $62,100.00 $62,100.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $6,200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $2,896.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Irrigation) $455.86
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $4,200.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Irrigation) $120.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $54,000.00 $54,000.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $6,000.00
(100 % due at Issuance of Building Permit)
Utility Final Inspection Fee $6,000.00
(100% due at Issuance of Building Permit)
Park Fee $154,200.00 $154,200.00
(100% due prior to Council Approval)
Roadway Impact Fee $67,744.00 - $67,744.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $363,460.80
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $338,044.00
* See Roadway Impact Fee Worksheet
DEVELOPMENT FEE WORKSHEET
PROJECT: CoppeE Greens, Pt~e I
DATE: 2/19/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
120 - 5/8 inch X 3/4 inch = 120 ESU's
2 - I inch = 5 ESU's
I - I 1/2 inch -- 5 ESU's
I - 2 inch -- 8 ESU's
Total #: 138 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection 1;ee:
Total #: 124 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 120 Domestic Meter(s) @ $24.14
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (lrrigation/Fireline):
Total #: 2 Irrigation Meter(s) @
Total #: I Additional Irrigation Meter(s) @
Total #: I Additional Irrigation Meter(s) @
(100% due prior to issuance of water meters)
$57.75
$144.38
$195.98
Water Meter Deposit Fee (Domestic):
Total #: 120 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Irrigation):
Total #: 4 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
120
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 120 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 120 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$62,100.00
$6,200.00
$2,896.80
$115.50
$144.38
$195.98
$4,200.00
20.00
$54,000.00
$6,000.00
$6,000.00
Page 3
DEVELOPMENT FEE WORKSHEEr
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
120
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
54,200.00
N/A
* $64,744.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
* See Roadway Impact Fee Worksheet
Need submittal of
development contracts
Page 4
ROAb WAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Coppell Greens, Phase 1
2/19/98
ROADWAY IMPACT FEE:
iService Area *
Category **
Land Use **
Buildin~ Size (ScI. Ft.)
Development Units **
Sil~e-Fami¥ Detacl~l
N/A
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due -- (Development Units) x
(Vehicle Miles ~r Development Uni0 x (Fee per Vehicle Mile) --
120
2.85
$300
$102,600.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Credit of $37,856.00 as per the development agreement
I,2 / s.~. x ~,s2~ s.~. = ,3~,~s~.oo~