Loading...
2013_0204CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACMOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE �/17 The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. e Reduced Pressure Principle ❑ Double Check Valve Manufacturer_ Model Number ' G Serial Number 4 lIX TYPE OF ASSEMBLY,,, ❑ Pressure Vacuum Breaker Atmosphere Vacuum Breaker Size 511/ Located At 5. W t-, G The above is certified to be true. Firm Name Certified Tester` _ Firm Address `' .; ./ -74 -7 I Z/ :,i Cert. Testa No. n 7 Date Gauge # Date last accuracy tested 7- 3 / - ), -L- White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight ❑ Closed Tight Z Leaked ❑ Opened at psid Opened at oSid pSid RP -_psid Leaked ❑ Did not Open ❑ Leaked ❑ Reps and Materials Used Test After Repair DC- Closed Tight ❑ Closed Tight ❑ Opened at osid Opened at pSid psid RP sid The above is certified to be true. Firm Name Certified Tester` _ Firm Address `' .; ./ -74 -7 I Z/ :,i Cert. Testa No. n 7 Date Gauge # Date last accuracy tested 7- 3 / - ), -L- White - Customer's Copy Yellow - City Copy Pink - Tester's Copy