Loading...
Coppell Greens 2-CS000828Sent b~:XEROX ~u9-28-00 09:15am ~rom 00000~214 384 5578 ~age 2/ 2 · ProChemical SOIL STABILIZATION OF TEXAS, INC. 8128t00 City of Coppell Attn: Kenneth M. Griffin, P.E. 255 Parkway Coppell, TX RE: Erosion Control Issues/Coppell Greens, Phase II Dear: ProChemical wilt be cleaning Killbridge Lane curb lines starting this afternoon. Metro Erosion Control will also be installing additional silt fencing to prevent the flow of mud into streets and storm drains. We will inspect the silt fencing daily and report any problems to Argus Development. ProChemical will endeavor to limit the amount of run-off entering public rights-of-way. If the silt fence alone does not stop the flow of sediment, it may be necessary to install I'lay bales on the inflow side of the fence. We would remind everyone, that even with the best silt fence and other sediment control devices, there will be some water run-off. We just hope that the amount of sediment contained in that run-off wilt be' minimal. We apologize for any inconvenience that this has caused the residents of Coppell Greens and wish to be a good neighbor during our stay. If there is anything that requires our immediate attention, please do not hesitate to contact us. Mike Horn , Vice President cc: Jeff Jesionowski Argus Development 00000 · ent~b~:×ERO× P~-28-00 09:14am ~ro~ ~0~214 ~04 ~570 ~a~e I~ 2 Date: Monday, August 28, 2000 To: City of Coppeil Kenneth M. Griffin, P.E. Phone: 972-304-3686 Fax: 972-304-3570 From: ProChemical Soil Stabilization of TX, Inc. Mike Horn Phone: 817-595-0299 Fax: 817-595-2323 Pages: 2_ Subject: per our telephone discussion this morning pis review attached Itr. if there is a problem in the future, i would like to have first call.