Loading...
WA9302A-CS 970513 (2)~997 1G: 09 214-3Gw""284 SHIMEK, JACOBS'~NKLE PAGE 81/88 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-$816 Fax (214) 361-0204 Phone (214) 361-7900 FAX TRANSMISSION COVER SHEET Fax Number: ~f}~ -~ o;~)t,/- 3 5r}/} From: Gary C. Henriticks Number of Pages Transmitted (including this one) I ~ 1 Date: May 13, 1997 To: Mr. Larry Davis City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Village Parkway Pump Station Additions Village Parkway Ground Storage Reservoir No. 2 Larry: Following are the letters you suggested we write to the contractors working at the Village Parkway Pump Station. Let me know what you think. In addition, we are sending you a copy of the letter we received today from North Texas. They appear to be aware of the continuing "temperature problem" on pump no. 6 and believe it to be related to the IQ-1000 module. After reviewing the winding temperatures that apparently occurred at 4:22 mn on May 12 and reported to us by Mr. Matt Cast, it is our opinion that temperatures in the ranges reported would have caused significant problems (and at least a burnt odor at the motor). We have discussed this problem with our electrical engineer and he concurs that the RTD in is likely the problem. We offer no objections to NTMCC approach to this problem and recommend they proceed with corrective rn, easures in an expeditious manner P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 To: Matt Cast, Supt. of Public Services Gary Henchicks P.E., Shimek, Jacobs & Finklea / FAX (214)361-7900 Mike Daigre, North Texas Municipal Contractors / FAX (214)368-4950 From: ~:.~onstmction Inspector lIE: WALK-THRU for Village Parkway Pump Station Project # WA 93-02A Date: May 2, 1997 A walk-thru for the referenced project has been scheduled for Wednesday, May 7, 1997 at 3:00 p.m. If I can be of further assistance please let me know. ~le/ldavis/Owalkthnl.mm 5 ~j~C~~~ _~~~ ~D ' SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 MEMORANDUM Transmitted via Facsimile To: Matt Cast Larry Davis Tedd Dutt North Texas Municipal Const tion Co Team Controls, Inc. Date: 5 Subject: Village Parkway Pump Station Additions -- SCADA System A meeting was held on April 24, 1997 at the Village Parkway Pump Station to discuss the status of the SCADA System project. In attendance were: Matt Cast, City of Coppell Steve Baker, Team Controls Tedd Dutt, City of Coppell Gary Hendricks, S.J.& F. Larry Davis, City of Coppell Curtis ?????, City of Coppell In general, we discussed the items included in the two "Punch List" letters from the City of Coppell dated April 11, 1997. Matt and Ted explained in detail to Steve Baker each item on the list in order to make sure Team Controls had complete understanding of the work remaining and problems encountered so far. In addition to the items on the punch list, Tedd Dutt informed Team Controls that the training hours included in the contract had not been fully exhausted and that some additional training on the use of the Tool Box would be helpful. We also discussed the letter from our office dated April 22, 1997. Steve indicated that he is the project manager and that he will designate in writing who will be the project superintendent on the project. We expect to get that written confirmation by Monday or Tuesday of next week. Steve also stated that he is wearing the pager previously worn by James Sipes and that it is programmed into the City's 911/411 alarm and paging system. Concerning the completion of the project, Steve Baker indicated Team would have adequate personnel on site starting Monday of next weel~ ( week of April 281h). Steve, the City still expects a written response from the contractor as to the commitment of personnel, designation of project superintendent and the schedule for completion of this project.