Loading...
Coppell Greens 2-CS 990816 ~he City With A Beautiful Future '.O. BOX 478 :OPPELL,TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 August 16, 1999 Mr. William Anderson Dowdey, Anderson & Associates, Inc. 5225 Village Creek Dr., Suite 200 Plano, TX 75093 IZE: Coppell Greens Phase 2 Dear Mr. Anderson: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: 1. Consider locating curb inlets on the property line where possible to allow flexibility in the driveway locations for the adjacent lots. 2. Provide a north arrow on each sheet. 3. The minimum time of concentration for drainage calculations is 10 minutes per~the City of Coppell Subdivision Ordinance. Longer Ti's may be used if calculations are provided supporting their use. 4. For the headwalls on lines "J" and "G", an extended headwall may be needed to support the slope. Also, show slopes to the headwall at all appropriate locations. 5. In the storm drain profiles, show pipe connections, all inlet locations, etc. Provide concrete collars at all pipe size changes. 6. The minimum grade for storm drain pipe is 0.3% per the Dallas Drainage Design Manual. 7. Provide an additional manhole on Line "L" as shown on the mark-ups. 8. On the utility plan, make sure to maintain 10' of separation between water mains and sanitary sewer lines. 9: All sanitary sewer manholes deeper than 12 '/Z feet need to be 5' in diameter. 10. Make sure that the grading plan matches the proposed drainage area map. There are various other comments throughout the plans. Once these comments have been addressed, these marked plans and two sets of revised plans should be submitted to the City for review. If you have any questions concerning these comments, contact me at (972) 304-7019. Sincerely, Kent M. Collins, P.E.