Loading...
Coppell CC 1B1-LR010706 ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT#: Koll Development Company Koll Center- Coppell 07/06/01 C01-0206-161 SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 max Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige BDD, Inc. - Russell Williams City of Coppell - Lee Stone City of Coppell - Larry Davis PROJECT DATA Placement Date: Sampled By: Weather: Supplier/Mix: FIELD DATA SET #1 Ticket #: 863269 Time Batched: 6:50 a.m. Slump (in.): 5.00 Air Content: 2.5* Conc. Temp. (°F): 86 Ambient Temp. (°F): 75 Time Sampled: Unit Weight (pcf): Yardage (c.y.): 06/28/01 Duane Vandergriff Rain Hanson - 7752 7:45 a.m. n/a 30 Placement Location: Paving area 60' north and 20' east of NE corner of bldg 1 Remarks: FIELD DATA SET #2 Ticket fl: 809947 Time Batched: 7:45 a.m. Slump (in.): 5.00 Air Content: 3.9 Conc. Temp. (°F): 85 Ambient Temp. (°F): 78 Placement Location: Pavin9 area 90' south and 40' east of NE corner of bldg 1 Remarks: Time Sampled: Unit Weight (pcf): Yardage (c.y.): 8:50 a.m. 120 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # Cylinder # Test Date A~e (Days) Max. Load (lbs) Area (sq. in.) IStren~th (psi) FC Notes A 07/05/01 7 105730 28.27 3740 1 B 07/05/01 7 102070 28.27 3610 C 07/26/01 28 28.27 D 07/26/01 28 28.27 E Hold A 07/05/01 7 114090 28.27 4040 2 B 07/05/01 7 114750 28.27 4060 C 07/26/01 28 28.27 D 07/26/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Resul s apply on y to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10810 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT#: Koll Development Company Koll Center - Coppell 07/06/01 C01-0206-161 SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 max Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige BDD, Inc. - Russell Williams City of Coppell - Lee Stone City of Coppell - Larry Davis PROJECT DATA Placement Date: 06~28~01 Sampled By: Duane Vandergriff Weather: Rain Supplier/Mix: Hanson - 7752 FIELD DATA SET #3 Time Batched: 8:48 a.m. Air Content: 4.0 Ticket #: 812355 Slump (in.): 5.5* Conc. Temp. (°F): 87 Ambient Temp. (°F): 79 Placement Location: Paving area 160' south and 50' east of NE corner of bldg 1 Remarks: *Slump exceeds specifications FIELD DATA SET #4 Ticket #: 863301 Time Batched: 10:04 a.m. Slump (in.): 4.75 Air Content: 4.1 Conc. Temp. (°F): 88 Ambient Temp. (°F): 85 Placement Location: Paving area 220' south and 20' east of NE corner of bldg 1 Remarks: Time Sampled: 9:45 a.m. Unit Weight (pcf): n/a Yardage (c.y.): 220 Time Sampled: 11:00 a.m. Unit Weight (pcf): Yardage (c.y.): 320 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # Cylinder# Test Date Age (Days) Max. Load (lbs) Area (sq. in.) Stren~lth (psi) FCI Notes A 07/05/01 7 90730 28.27 3210 3 B 07/05/01 7 84370 28.27 2980 C 07/26/01 28 28.27 D 07/26/01 28 28.27 E Hold A 07/05/01 7 98480 28.27 3480 4 B 07/05/01 7 96420 28.27 3410 C 07/26/01 28 28.27 D 07/26/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This repod is for the exclusive use of the Client addressed. This repod may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT#: Koll Development Company Koll Center - Coppell 07/06/01 C01-0206-161 SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 max Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. ~ Andy Brundige BDD, Inc. - Russell Williams City of Coppell - Lee Stone City of Coppell - Larry Davis PROJECT DATA Placement Date: 06/28/01 Sampled By: Duane Vandergriff Weather: Rain SuppliedMix: Hanson - 7752 FIELD DATA SET #5 Ticket #: 863311 Time Batched: 11:26 a.m. Time Sampled: Slump (in.): 4.50 Air Content: 3.9 Unit Weight (pcf): Conc. Temp. (°F): 91 Ambient Temp. (°F): 88 Yardage (c.y.): Placement Location: Paving area 180' north and 30' east of SE corner of bldg 1 Remarks: 12:15 p.m. n/a 42O FIELD DATA SET #6 Ticket #: 863321 Time Batched: 12:25 p.m. Slump (in.): 5.00 Air Content: 4.1 Conc. Temp. (°F): 94 Ambient Temp. (°F): 88 Placement Location: Paving area 80' north and 35' east of SE corner of bldg 1 Remarks: Time Sampled: Unit Weight (pcf): Yardage (c.y.): 1:30 p.m. 520 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C6'17 Set # Cylinder# Test Date Age (Days) Max. Lead (lbs) Area (sq. in.) Strength (psi) FC Notes A 07/05/01 7 120790 28.27 4270 5 B 07/05/01 7 116480 28.27 4120 C 07/26/01 28 28.27 D 07/26/01 28 28.27 E Hold A 07/05/01 7 103540 28.27 3660 6 B 07/05/01 7 100810 28.27 3570 C 07/26/01 28 28.27 D 07/26/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply on y to above res s. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING '10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT#: Koll Development Company Koll Center - Coppell 07/06/01 C01-0206-161 SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 max Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige BDD, Inc. - Russell Williams City of Coppell - Lee Stone City of Coppell - Larry Davis PROJECT DATA Placement Date: 06/28/01 Sampled By: Duane Vander~lriff Weather: Rain SuppliedMix: Hanson - 7752 FIELD DATA SET #7 Ticket #: 863333 Time Batched: 2:48 p.m. Slump (in.): 5.00 Air Content: 5.1 Conc. Temp. (°F): 91 Ambient Temp. (°F): 92 Placement Location: Paving area 10' south and 25' east of SE corner of bldg 1 Remarks: Time Sampled: 3:30 p.m. Unit Weight (pcf): n/a Yardage (c.y.): 620 Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: FIELD DATA SET #8 Time Batched: Air Content: Ambient Temp. (°F): Time Sampled: Unit Weight (pcf): Yardage (c.y.): Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # Cylinder# Test Date A~e (Days) Max. Load (lbs) Area (sq. in.)Strength (psiIFC Notes A 07/05/01 7 114510 28.27 4050 7 B 07/05/01 7 113210 28.27 4000 C 07/26/01 28 28.27 D 07/26/01 28 28.27 E Hold 8 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE, (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the wr tten consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center - Coppell 07/06/01 C01-0206-160 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Ston~e City of Coppell - Larry Davis SPECIFICATIONS % Compaction: % Moisture: 97 -2 to +3 TEST DATA Date Tested: 06/28/01 Technician: D. Vander~riff MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY (pcf) 342 ASTM D 698 Brown Clay 23.5 98.8 343 ASTM D 698 Grayish Brown Cia)/ 23.2 99.0 344 ASTM D 698 Dark Brown Cia)/ 23.9 97.5 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY 1R Final Retest of Test #6, dated 06/27/01 342 24.1 98.0 + 0.6 99.2 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC.