Loading...
Coppell CC 1B1-LR010620 ,LLIANCE GEOTECHNICAL GRO GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center - Coppell 06/20/01 C01-0206-136 SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 Air Content (%): 3.5 - 6.5 ConcreteTemp (°F): 95 max Ticket #: 848658 Slump (in.): 5.00 Conc. Temp. (°F): 87 Placement Location:' Pavin Remarks: Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of. Coppell - Larry Davis PROJECT DATA Placement Date: 06/1 1/01 Sampled By: Duane Vandergriff Weather: Sunny Supplier/Mix: Hanson #7752 6:35 a.m. Time Sampled: na Unit Weight (pcf): : 83 Yardage (c.y.): #3 200' S and 30' W of NW Corner 7:15 a.m. n/a 10 of 650 FIELD DATA SET #2 848668 Time Batched: 8:00 a.m. Time Sampled: 5.00 Air Content: na Unit Weight (pcf): 90 Ambient Temp. (°F): 85 Yardage (c.y.): Paving on West Side of Building #3 350' S and 30' W of NW Corner 8:45 a.m. n/a 10 of 650 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 ,Set # Cylinder# Test Date Age (DaysI vlax. Load (lbs)Area (sq. in.) Strength (psi)FC Notes A 06/18/01 7 119520 28.27 4230 1 B 06/18/01 7 117620 28.27 4160 C 07/09/01 28 28.27 D 07/09/01 28 28.27 hold A 06/18/01 7 91350 28.27 3230 2 B 06/18/01 7 96150 28.27 3400 C 07/09/01 28 28.27 D 07/09/01 28 28.27 hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 INote: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP LLIANCE GEOTECHNICAL GROr GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center- Coppell 06/20/01 C01-0206-138 REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 max Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max PROJECT DATA Placement Date: 06/12/01 Sampled By: Duane Vandergriff Weather: Sunny Supplier/Mix: Hanson #9349 FIELD DATA SET #3 Ticket Cf: Time Batched: 12:30 p.m. Slump (in.): 5.00 Air Content: na Conc. Temp. (°F): 91 Ambient Temp. (°F): 91 Placement Location: Buildin~l #1 slab at N. end A-C, 0-1.5 Time Sampled: 1:30 p.m. Unit Weight (pcf): n/a Yardage (c.y.): 10 Remarks: FIELD DATA SET #-4 Ticket Cf: 727532 Time Batched: Slump (in.): 4.00 Air Content: Conc. Temp. (°F): 93 Ambient Temp. (°F): Placement Location: Manhole on sanitar}/sewer 12 Remarks: 3:00 p.m. Time Sampled: 4:15 p.m. 5.0 Unit Weight (pcf): na 93 Yardage (c.y.): 5 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 SetCf Cylinder Cf Test Date A~le (Days) Max. Load (Ibs)l Area (sq. in.) Strength (psi) FC Notes A 06/19/01 7 126980 28.27 4490 3 B 06/19/01 7 120440 28.27 4260 C 07/10/01 28 28.27 D 07/10/01 28 28.27 E Hold A 06/19/01 7 96690 28.27 3420 4 B 06/19/01 7 97990 28.27 3470 C 07/10/01 28 28.27 D 07/10/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 INote: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP LLIANCE GEOTECHNICAL GRO' GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center- Coppell 06/20/01 C01-0206-138 REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 max Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max PROJECT DATA Placement Date: 06/12/01 Sampled By: Duane Vandergriff Weather: Sunny Supplier/Mix: Hanson #9349 FIELD DATA SET #1 Ticket #: 848725 Time Batched: 6:30 a.m. Time Sampled: Slump (in.): 4.50 Air Content: 5.5 Unit Weight (pct'): Conc. Temp. (°F): 90 Ambient Temp. (°F): 79 Yardage (c.y.): Placement Location: Paving west side of bldg #3 - 50' N. and 50' W. of SW corner Remarks: 7:45 a.m. n/a 4O FIELD DATA SET #2 Ticket#: 862585 Time Batched: 8:40 a.m. Time Sampled: Slump (in.): 5.00 Air Content: 5.5 Unit Weight (pcf): Conc. Temp. (°F): 91 Ambient Temp. (°F): 79 Yardage (c.y.): Placement Location: Paving west side of bldg #2 - 20' N. and 50' W. of NW corner Remarks: 9:45 a.m. Da 140 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # Cylinder# Test Date Age (Days) Max. Load (lbs) Area (sq. in.) Strength (psi) FCI Notes A 06/19/01 7 114130 28.27 4040 1 B 06/19/01 7 111040 28.27 3930 C 07/10/01 28 28.27 D 07/10/01 28 28.27 E Hold A 06/19/01 7 73410 28.27 2600 2 B 06/19/01 7 77060 28.27 2730 C 07/10/01 28 28.27 D 07/10/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. IThis report may not be reproduced except in its entirety, without Ithe written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP _LIANCE GEOTECHNICAL GROI GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10010 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center - Coppell 6/20/01 C01-0206-136 REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max PROJECT DATA Placement Date: 6/11/01 Sampled By: Duane Vandergriff Weather: Sunny Supplier/Mix: Hanson #7752 FIELD DATA SET #5 Ticket #: 848709 Time Batched: 2:00 p.m. Slump (in.): 5.00 Air Content: 5.5 Conc. Temp. (°F): 95 Ambient Temp. (°F): 97 Placement Location: Paving on W Side of Building #3 50' S and 35' W Remarks: Time Sampled: 3:00 p.m. Unit Weight (pcf): n/a Yardage (c.y.): 420 of 420 Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: FIELD DATA SET # Time Batched: Air Content: Ambient Temp. (°F): Time Sampled: Unit Weight (pcf): Yardage (c.y.): Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# Cylinder# Test Date Age (Days) Max. Load (lbsI Area (sq. in.) Strength (psi) FC Notes A 6/18/01 7 101530 28.27 3590 D B 6/18/01 7 100920 28.27 3570 C 7/9/01 28 28.27 D 7/9/01 28 28.27 hold (1) NORMAL CYLINDER SIZE 6"X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 INote: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP .LIANCE GEOTECHNICAL GROt GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center- Coppell 6/20/01 C01-0206-136 REPORT DISTRIBUTION: Koll Development Company - James Williams Hill & Wilkerson, Inc. - Kirk Woltman Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS Strength (psi): 4000 Slump (in.): 5 Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max PROJECT DATA Placement Date: 6/11/01 Sampled By: Duane Vandergriff Weather: Sunny Supplier/Mix: Hanson #7752 FIELD DATA SET #3 Ticket #: 848679 Time Batched: 9:25 a.m. Time Sampled: Slump (in.): 4.50 Air Content: 4.5 Unit Weight (pct'): Conc. Temp. (°F): 90 Ambient Temp. (°F): 90 Yardage (c.y.): Placement Location: Paving on W Side of Buildin~l #3 300' S and 20' W of NW Corner Remarks: 10:30 a.m. n/a 210 of 650 FIELD DATA SET #4 Ticket #: 848696 Time Batched: 12:15 p.m. Time Sampled: Slump (in.): 5.00 Air Content: 6.5 Unit Weight (pcf): Conc. Temp. (°F): 94 Ambient Temp. (°F): 96 Yardage (c.y.): Placement Location: Paving on W Side of Building #3 200' S and 50' W of NW Corner Remarks: 1:00 p.m. n/a 320 of 650 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set#1 Cylinder# Test Date Age/Days) Max. Load/lbs) Area (sq. in.)Strength (psi)FC Notes A 6/18/01 7 109770 28.27 3880 3 B 6/18/01 7 110320 28.27 3900 C 7/9/01 28 28.27 D 7/9/01 28 28.27 hold A 6/18/01 7 79610 28.27 2820 4 B 6/18/01 7 79280 28.27 2800 C 7/9/01 28 28.27 D 7/9/01 28 28.27 hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE iN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 INote: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP