Loading...
WA9302A-CS 970422 (2) SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #g20 Dallas, Texas 75225-5816 F~ (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE n. CARTER. P.E. April 22, 1997 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Transmitted Via Facsimile North Texas Muni 'pal Construction Co., Inc. 5614 Dyer Stre Dallas, Te~ Re: Village Parkway Pump Station Addition Status of Change Orders No. 2 & 5 Gentlemen: On April 17, 1997, the City of Coppell provided you the punch list for the work being performed by your subcontractor, Team Controls, Inc. on the SCADA System Change Orders No. 2 and 5. The City of Coppell has reported that the SCADA System remains incomplete and that little effort is being made to complete the project. The contract completion date for all work on the project was April 10th, 1997, as modified by Change Order No. 5. Today, the City has reported the WIN-911/411 Alarm and Paging System is not operational even though GTE made the necessary repairs to the pump station phone lines. Circumstances surrounding the delays of the startup and testing the disinfection system as included in the original scope of work on the project, are understood and acknowledged by the City of Coppell. However, it is imperative that the work included in Change Orders No. 2 and 5 be completed and that the SCADA System be fully operational with a high level of confidence prior to the traditional peak summer time demand period. The City of Coppell estimates the peak summer demands is expected to begin within the next three weeks. As a reminder, the Village Parkway Pump Station is the sole source of water supply for the City of Coppelt. The efficient and reliable operation of the SCADA System is critical to the proper operation of the public water system. Your subcontractor has verbally indicated they are committed to provide the personnel necessary to complete the work required by the contract documents, but their actions do not appear to support this commitment. Further, we understand there has been a change in personnel at Team Controls, Inc. At this stage, we are not clear who is the project superintendent for the SCADA work. Please have your subcontractor provide us in writing the name of the project superintendent responsible for the completion of this project. Further, in order to mitigate problems and enhance response time, the City requests the SCADA superintendent, or his designated appointee, wear a pager programmed into the City' s 911/411 alarm and paging system. You are hereby directed to furnish the necessary work force, equipment and materials required to complete the SCADA portion oft his project in all respects, including the 911/411 Alarm and Paging System. Please submit a schedule for the timely completion of the project by no later than Thursday, April 241h. The City expects the schedule to show all items of work for the SCADA System to be completed, including final walk through by North Texas Municipal Con,'~':tion Co., Inc. April 22, 1997 Page No. 2 no later than May 9, 1997. As discussed in the pre-construction conference, the City of Coppell's normal working hours are between the hours of 7:30 a.m. and 5:00 p.m. Work to complete this project shall be performed during these hours unless there is an emergency situation as declared by the owner. The City will review the progress on this portion of the contract daily and make a determination as to the contractor's ability to meet the schedule. If the work is not progressing as expected, the City will take the necessary steps as provided in the contract documents to have a fully operational system by May 9, 1997. If you have any questions or need any clarification regarding the City of Coppell's position on this matter, please do not hesitate to contact this office. Sincere you co: x~r~ Kenneth M. Griffin, P.E. . H~ , . . Mr. Matt Cast Mr. Larry Davis J:\coppell\94156~onst~scdalate,doc