Loading...
Coppell Industrial-CS001114Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS Letter of Transmittal TO: Mike Martin, P.E. City of Coppell Engineering Department DATE: 14-Nov-00 RE: Coppell Industrial Addition - Phase 1 W.O. No. 9741-1091 WE ARE ENCLOSING: No. Copies Description 2 Revised sheet C18 - Pump Station Details 2 Technical Report on Hydrologic Methodology and Pond Parameters For Your Use: XXXX As Requested: Remarks: For Your Approval: Approved as Noted: This is being submitted as an alternative solution in the event downstream improvements are not complete when Champion needs to finalize their phase 1 construction. Sorry Neal's report reads like a college text with formula derivations but we could not figure out a better way to present the information. Signed: Chuck Stark, P.E. CC to: 616 Six Flags Dr., Suite 400 * Arlington, Texas 76011 * (8! 7)640-6535 * Fax (817)633-5240 e-mail .qaicivil~.flash.net