Coppell Industrial-CS001114Graham Associates, Inc.
CONSULTING ENGINEERS & PLANNERS
Letter of Transmittal
TO:
Mike Martin, P.E.
City of Coppell Engineering Department
DATE:
14-Nov-00
RE: Coppell Industrial Addition - Phase 1
W.O. No. 9741-1091
WE ARE ENCLOSING:
No. Copies Description
2 Revised sheet C18 - Pump Station Details
2 Technical Report on Hydrologic Methodology and Pond Parameters
For Your Use: XXXX
As Requested:
Remarks:
For Your Approval:
Approved as Noted:
This is being submitted as an alternative solution in the event downstream improvements are not
complete when Champion needs to finalize their phase 1 construction.
Sorry Neal's report reads like a college text with formula derivations but we could not figure out a better
way to present the information.
Signed: Chuck Stark, P.E. CC to:
616 Six Flags Dr., Suite 400 * Arlington, Texas 76011 * (8! 7)640-6535 * Fax (817)633-5240 e-mail .qaicivil~.flash.net