Loading...
Coppell Industrial-CS000330DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-185, Coppell Industrial Addition, a zoning change request from LI (Light Industrial) to PD-LI (Planned Development, Light Industrial), to allow a phased development of 2 office/warehouse facilities totaling 1,900,000 square feet of space on approximately 100 acres of property located along the north side of W. Bethel Road and 50' east of N. Royal Lane, at the request of Champion Partners. DRC DATE: March 30, 2000 and April 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENTSTATUS: pr~'r rn/rrr, ra ~v V'FINAL 1. There is a concern about park traffic using the proposed main North-South drive as a cut- thru from Creekview to Bethel Road. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell Industrial Addition, Preliminarv Plat, to allow a phased development of 2 office/warehouse facih'ffes totaling 1,900,000 square feet of space on approximately 1 O0 acres of property located along the north side of gE. Bethel Road and 50' east of N. Royal Lane, at the request of Graham Associates, Ina DRC DATE: March 30, 2000 and April 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENTSTAITJS: ~,~r rn,rrnrA ~v ',/FINAL No comments. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell Industrial Addition, Final Plat, to allow a phased development of an officeAvarehouse facility totaling 600, 000 square feet of space on approximately 33 acres of property located along the north side of FF. Bethel Road and 50' east of N. Royal Lane, at the request of Graham Associates, Ina DRC DATE: March 30, 2000 andApril 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT STA TU$: r~r, r:r rn,rrn r n l~V ,/FINAL ~, r:~zrewn AFTER P~ No comments. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-185, Coppell Industrial Addition, a zoning change request from LI (Light IndustriaO to PD-LI (Planned Development, Light Industrial), to allow a phased development of 2 office/warehouse facilities totaling 1,900,000 square feet of s£aee on approximately 100 acres of property located along the north side of W. Bethel Road and 50' east of N. Royal Lane, at the request of Champion Partners. DRC DATE: March $0, 2000 and April 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-$04-$679) COMMENT STATU$: ,/PRELIMINARY ~wra~ .~r A..~t ~.~ wt./tewn~..~._. 1. There is a concern about park traffic using the proposed main North-South drive as a cut- thru from Creekview to Bethel Road. 2. The maximum allowable driveway width is 40'. 3. The bar scale does not match the drawing scale on the site plan. 4. Brick pavers will be required at all driveway locations per City Streetscape Plan. These should be shown on the site plan and landscape plan. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell Industrial Addition, Preliminar~ Plat, to allow a phased development of 2 office/warehouse facilities totaling 1,900,000 square feet of space on approximately 100 acres of property located along the north side of W. Bethel Road and 50' east of N. Royal Lane, at the request of Graham Associates, Inc. DRC DATE: March 30, 2000 and April 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT STA TU$: ,~'PRELIMINARY 1. Locate the water meter vaults in a 20'x20' easement outside of the R.O.W. 2. Show the domestic and irrigation water services on the utility plan. 3. The proposed off-site easements will need to be provided to the City prior to construction. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Co£pell Industrial Addition, Final Plat, to allow a phased development of an office~warehouse facility totaling 600, 000 square feet of space on approximately $$ acres of property located along the north side of W. Bethel Road and 50' east of N. Royal Lane, at the request of Graham Associates, Inc. DRC DATE: March $0, 2000 and April 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-$04-$679) COMMENT STATUS: ,/PRELIMINARY ~wr~ ~ .~ r a~ r ..~ ra wt/tcwr~. ~.~ 2. 3. 4. Provide a note on plat stating that sidewalks would be constructed by owner when deemed necessary by City Engineer. Provide the floodplain permit paragraph and floodplain administrator signature block. A meeting needs to be held to discuss the proposed drainage plan with the City Engineering Staff. Need separate instrument document for off-site 10' common access easement if this driveway is built before the adjacent property is platted.