Loading...
Coppell Health-CS 890519 GINN, INC. CONSULTING ENGINEERS Mr. Russell Doyle, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Coppell Medical Center Drainage Dear Mr. Doyle: Per your Handwritten Memorandum dated 5/17/89 regarding drainage for the above referenced site, proper drainage should be accommodated for in Roberts and Dowdey's Medical Center construction plans and also in Jerry Parche's Heartz Road construction plans. As you are aware, the entire Town Center area along with the Coppell Medical Center are to be developed in phases. Drainage is being designed for ultimate development of the watershed and thus, as each phase is constructed, additional storm sewers will be constructed to correspond to that phase. In the interim, some undeveloped areas on private property may become inundated, however, wherever buildings are erected the drainage shall be installed to accommodate these areas. We hope this appropriately addresses your needs. Sincerely, /~ Kevin~e/~i f fS~//p. E. KP/dsp cc: File 89305 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900