Loading...
Coppell Health-CS 890125 GINN, INC. CONSULTING ENGINEERS January 25, 1989~ Mr. Russel/D~le, P.E., City Engineer City of j~6ppell P.O. B~ 478 Coppe~l, TX 75019 Re: Metrocrest Hospital Authority Proposed Lake and Maintenance Agreement DRC - Engineering Dear Mr. Doyle: We have reviewed the attached agreement and offer the following comments. The exhibits referenced in the agreement, Exhibits A through D, were not included in our copy of the Agreement. Construction plans for the lake need to be submitted to the DRC before complete evaluation can be made regarding the Agreement. In general, we agree with Mr. Larry Jackson. The Agreement appears to be too one-sided putting more emphasis on the City's acceptance and maintenance of the streets, utilities, and the lake rather than on the quality and standards of construction of the lake. No construction plans as stated above have been submitted yet to the DRC staff showing normal pool elevations anticipated, water levels (high & low), overflow control, provisions for maintaining water levels in exceptionally dry climate periods, aeration, liners, soil borings, etc. With the above information and some design/construction standards and parameters established for the lake in the Agreement just as was done with the proposed Univest lake West of MacArthur and North of Moore Road, we feel an Agreement on this subject could be entertained. Please call if you have any other questions. Sincerely, t/7 Kevin Peiffer/ ~.E. KP/dsp cc: H. Wayne Ginn, P.E. File 89305 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900