Loading...
WA9301-CS 971001 (2) PRE-CONSTRUCTION MEETING COPPELL 2 METERING STATION CONTRACT NO: 94-81 OCTOBER 1, 1997 ~ Loo AGENDA INTRODUCTION Ref. Handout of Attendees sign in sheet. Form provided to Bar Constructors for Contractor's personnel names, titles and emergency phone numbers. DESCRIPTION OF PROJECT Ref. Part A2. This project consists of construction of a new Coppell 2 Metering Vault located on the site of the City of Coppell Village Parkway Pump Station Located on Kimbel Court Road at Village Parkway. Details of location and construction are shown on Map 685W-676C plan-profile sheets 1, 2 and Map 68 1 Q-18A.2 sheets 1 thru 15 and the applicable Appurtenance Sheets. COMMUNICATIONS/COORDINATION Send all correspondence, construction schedules and pay applications to Project Manager, Jennifer CoRingham P.E. at address given in Section 01300 Part 1.11. Send Submittals to Henry G. Niblo P.E. at Pipeline Project Management, 2121 Main Street, Suite 300, Dallas, TX 75201 with a transmittal copy to the Project Manager. Obtain all RFI numbers from the Project Manager. Send RFI's to Design Engineer with a transmittai copy to the Project Manager. T, GOOD FAITH M/WBE Ref. A10. Efrain Ochoa214-948-4521. SURVEY All control datum is shown on the plans. The contractor is responsible for locating and protecting these points. EVALUATION Ref. A 3. S-7. Form provided to BAR Constructors by Project Manager. PROJECT PARTNERING Ref. Section 01012. Partnering session to be ~cheduled within days of Notice to Proceed at a neutral site acceptable to all parties. vl o ,~': ' ' ~ ~i PAYMENT/MONTHLY ESTIMATE Cut off date for monthly estimates is the 10th of each month. SUBMITTALS Ref. A3. S-8 and Section 01300. Contractor should prepare a Submittal Transmittal Form for routing Submittals and Shop Drawings. This form shall meet the needs of the Contractor, Design Engineer and Owner/City. Stamp shop drawing submittals with a Contractor Conformante Statement Stamp in NON-RED ink. See Example. CONTRACT 94-081 - COPPELL 2 METERING STATION - PRECONSTRUCTION MEETING - PAGE 1 STORMWATER POLLUTION PREVENTION/PERMITS RefA3. S-13. NOI is not required however, Contractor is required to provide STORM WATER nmoff protection. GOOD FAITH-NEIGHBORHOOD JOB OPPORTUNITIES ReE A3. S-14. Form provided in specifications pan A3 page 9. PREVAILING WAGE RATE SCALE Ref. A5. Wage rates will be routinely verified during construction. TIME RefA7. The time allotted for the completion oftMs contract is May 1, 1998. SPECIFICATIONS Ref AS. for fist of documents. ADDENDA ReE A9. There is ONE addendum. Receipt acknowledged by PROGRESS MEETINGS Monthly time and date to be determined. l ~q" I{ Be CONSTRUCTION SCHEDULES Submit to the Project Manager in Timeline 6 format. SCHEDULE OF VALUES Ref.. Section 01300. Submit to the Project Manager. WORKING HOURS Ref. DWU Addendure to NCTCOG. Working hours shall be between 7:00 am and 6:00 pm. Any and all variances shall first be approved by the Project Manager. INSPECTION FF, tS_Ref._D_WU Addendum to NCTCOG. Example invoice letter provided by DWU. TEMPORARY FACILITIES AND CONTROLS Ref. Section 01500. Project sign, Trailer and contents, and cellular phone are items which are needed first. RFI'S Request For Information (RFI) shall be on a form that meets the needs of the Contractor, Design Engineer, and the Owner/City. An example form is provided by the Project Manager The Contractor should use this form through-out this contract. Any alterations required by the Contractor should be coordinated through the Project Manager. CHANGE ORDER If change orders are required they will be written by the Project Manager following a completed Request-For-Information (RFI) that justifies the addition or deletion. TAX EXEMPTION FORM Form provided to BAR Constructors by Project Manager. LIOUIDATED DAMAGES Ref. NCTCOG General Specifications Item 1.36 and notice to proceed letter. Liquidated damages are $500.00 per day. CONTRACT 94-081 - COPPELL 2 METERING STATION - PRECONSTRUCTION MEETING- PAGE 2 OTHER BUSINESS OTHER FORMS PROVIDED: 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Contractors Emergency Contact Form. Good Faith Effort Form. Post Construction Contractor Evaluation Form. AIA Pay Application Format Form Contractor's Submittal Stamp Example. Good Faith Neighborhood Job Opportunity Form. Inspector Overtime Invoice Sample. Request for Information Form. Tax Exemption Form. Contractor's Report on Subcontractor Payment. First Tier Subcontractor Evaluation. CONTRACT 94-081 - COPPELL 2 METERING STATION - PRECONSTRUCTION MEETING - PAGE 3