Loading...
CF-Police/Ct Lot-CS 980521 MEMORANDUM FROM TIlE DEPARTMENT OF ENGINEERING ro~ From: Date: RE: Clay Phillips, Deputy City Manager Kenneth M. Griffin, P.E., Dir. of Engineering / Public Works May 21, 1998 Criminal Justice Center Parking Lot As requested, I have contacted the contractor who is currently doing our Sidewalk and Street Replacement Program to obtain pricing on construction of the proposed parking lot south of the Criminal Justice Center. A copy of the construction plan was provided to the contractor showing the general configuration necessary for the parking lot. They provided a total pricing of $52,714 for the parking lot. This includes the concrete, construction staking and the lime stabilization. I am unsure where the City is wanting to go with this pricing. My recollection is that this pricing is higher than what the original bid was for the parking iot. With this memo I have attached a copy of their estimate. If you have any questions please contact me. "CID' OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN"