Loading...
Conoco-CS 881013TO GINN, INC. Consulting Engineers 17103 Preston Road Suite 100, LB-118 DALLAS TEXAS 75248 WE ARE SENDING YOU [] Shop drawings [] Copy of letter Attached [] Prints [] Plans [] Samples I~ Change order ,1~r/ ~*',~>' d~'~?/~(;''~''' [] Specifications COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: [] For approval ~ Approved as submitted F_] Resubmit  / For your use [] Approved as noted [] Submit [] As requested [] Returned for corrections [] Return [] For review and comment ~ copies for approval copies for distribution corrected prints [] PRINTS RETURNED AFTER LOAN TO US [] FOR BIDS DUE. 19 / SIGNED: enclosures are not as noted, kindly notify us at once Mr. John C. t<arlsruher, P.E. Project Engineer Ginn, Inc. Consulting Engincers 17103 Prcston Road Suite 100, LB 118 Dallas, Texas 75248 SALI,IN(;I'3R, NICIIOI,S, ,JACKSON, KII{K & DILl,AlU) (Fm'mcrly S.l.,r, ,hu'k, ,'q;dlin~cr & Nichols) Al/m'n.ys & (;mumeh.'s al, },aw 1800 1,in('oln l)laza 500 N. Akard ])alhts. T('xas 75201 {214) F,csimilc (214) 954-3;1:~4 October' 3, 1988 Il xv/J;:' 4fi,'',4' .... 198 Re: ' Denton Tap Road hnprovements from Belt Line Road to Sandy Lake Road, Coppell, Texas; Our File No. 232 (Explorer Pipeline Company Agreement) Dear John: Pursuant to your transmittal letter of August 30, I have reviewed the attached Explorer Pipeline Company agreement dated November 30, 1987. I have no objection to tire hold harmless agreement set forth in paragraph 2. Although the remaining paragraphs 3 through 14 place certain responsibilities on tile city, they do not pose any legal problems. Therefore, I have no objection to tile form of the agreement and can recommend that the city execute tile same. }'lease call if you have arty questions. Very truly yours, LWJ/sb SALI,INGF, I~., NICIIOLS, JACKSON, I<II{K & I)II,I,AI{I) Enclosure CC: Mr. Alan D. Ratliff (w/Enel.) City Manager City of Coppell P. O. Box 478 Coppell, Texas 75019 C/{?LOF, IJ)lP lLIJ] rc com? rl¥ ~ichard ~. P~rdu~ November 30, 1987 Mr. Alan D. Ratli~f City Manager Coppell, Texas Re: Denton Tap Road Widening M.P. 48.16, Dwg. 237-AA-1015, Dallas County, Texas Gentlemen: In responsc to your request for approval to widen Denton Tap Road across Explorer Pipeline Company's 12 inch pipeline, permis- sion is hereby granted only insofar as Explorer has the right, title and interest to grant such permission, subject to the fol- lowing terms and conditions: Explorer's District office shall be given written notice at least 48 hours in advance of any construction contemplated in order that a representative of Explorer may be present. Please contact Explorer's representative at the office indicated below: Mr. A.. C. Shackelford Supervisor of Operations & Maintenance Explorer Pipeline Company Route 1, Box 354 Caddo Mills, TX 75005 o Telephone: (214) 527-3151 You hereby agree to assume the risk of, and shall protect, in- demnify and save harmless Explorer from and against all liabilit[ for or on account of, injury to or death of persons or damage to property, including livestock killed or injured, resulting from your operations, except where such injury, death, or damage shal be caused by the sole negligence of Explorer, its agents, servants, or employees or otherwise. Page 2. o o 10. 11. 12. 13. 14. In the event your proposed facility endangers and/or interferes With Explorer's pipeline, you agree to take the necessary action, at your sole cost and expense, to eliminate any such condition· You shall not permit heavy equipment to work over Explorer's pipeline, and any machine ditching shall not be closer than 15 feet to Explorer's pipeline without prior approval of Explorer's field representative. Your utilities shall cross at least 12 inches above/below Explorer's pipeline. This depth shall be maintained thc full width of Explorer's right of way. No casing required under roads unless the city or county regulations require casing. If casing required, to be installed by Explorer at developer's expense. Explorer will, on a reimbursable basis, install concrete slabs, and/or casing if required, furnishing upon request a cost estimatc. A minimum of 5'-0" of cover is required between surface of road and top of pipe if no casing installed. If drain ditches are installed along roadways, concrete slabs are to be installed 12" over pipeline if depth is less than three feet, at developer's expense. No reduction of cover to be made at any location over the pipeline and any proposed additional cover placed over pipe- line to be approved by Explorer. The following warning shall be added to thc construction prints as follows: "WARNING! ! ! Explorer's 12" Petroleum Pipeline - Contact A. C. Shackelford 48 Hours Bc£ore Construction Begins (214) 527-3151 .:' Final plans and profiles to be submitted to Explorer Pipe- line Company, Engineering Department, P. O. Box 2650, Tulsa, OK 74101 for approval. After your proposed facilities have been completed, three copies of your as-built plats shall be forwarded to this office. This written permission may not be assigned by you without the prior written consent of Explorer. Page 3. Please signify acceptance of these terms and conditions by having an authorized official of your company affix his signature in the space provided below and return one copy for our file. The attached as-built alignment sheet, Drawing No. 237-AA-1015 is for your use and information. Yours very truly, EXPLORER PIPELINE COMPANY . .. Richard M. Perdue Manager, Right of Way, Safety & Security jes Atts. cc: R. E. Sands J. B. Bcnear S. L. Irwin A. C. Shackelford g. C. Karlsruher, Ginn, Inc. ACCEPTED AND AGREED TO THIS By: DAY OF , 1987. Title: GINN, INC. CONSIII/FING I, NGINI, EIIS August 30, 1988 Mr. Lawrence W. Jackson Sallinger, Nichols, Jackson, Kirk & Dillard 1800 Lincoln Plaza 500 N. Akard Dallas, Texas 75201 Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road, Coppell, Texas Dear Mr. Jackson: We have reviewed the attached proposed agreement between Explorer Pipeline Company and the City of Coppell concerning the improvement of Denton Tap Road. We have no objections to any of the provisions contained in this proposed agreement. Please review this proposed agreement and if it is acceptable to you please recommend to the City that they execute the agreement as soon as possible in order to avoid delays in the construction of Denton Tap Road. Please call me if you have any questions. Sincerely, Jo~n~C. Karlsruher, P.E. Project Engineer Attachments cc: H. Wayne Ginn, P.E. Alan D. Ratliff w/attachments J-378