Coppell Church-CS 901107GINN, INC.
November 7, 1990
Ms. Shohre Daneshmand, P.E.
City of Coppell
P.O. Box 478
Coppell, TX 75019
CONSULTING ENGINEERS
Re:
Coppell of Christ
Water, Sanitary Sewer and Drainage Plan
Dear Ms. Daneshmand:
We have reviewed the above referenced plans for general
conformance to the City of Coppell ordinances and standards. The
following sets forth our comments.
Extend 8" waterline from Samuel Blvd. along south side of
building to west, add fire hydrant for additional fire
protection. Provide for future extension to west to
complete "looped" system.
Indicate what happens to drainage at southwesternmost corner
of property.
Provide information regarding permission from property owner
regarding temporary swale along south property line.
Indicate how long temporary swale will be in place.
On drainage calculations, area #4 should reflect future
design conditions not existing.
Is there a conflict with sanitary sewer stub-out or water
services stub-outs with the TU Electric easement? Please
address.
Provide details of pavement/repair replacement on Samuel
Blvd. where waterlines occur.
Sanitary sewer shall be minimum 8" diameter and constructed
with dry bore - no "wet" bores allowed.
Provide grading and drainage plan for site with elevations,
grades, etc.
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
Other than the above stated items, we have no further objections
to the plans as submitted. Should you have any questions or need
additional information, please contact our office.
Sincerely,
Gabe Favre
GF/dsp
cc:
Steve Goram
Taryon Bowman
Dan Dowdey and Assoc.
H. Wayne Ginn, P.E.
File 90441