Loading...
ST9902-101102 Halie Hernandez From:Keith Marvin Sent:Tuesday, November 02, 2010 11:18 AM To:Wally Jones Cc:kfichtner@allegiancetitle.com Subject:RE: 250 W. Sandy Lake Wally, One question before I comment on the proposal. As I said there will be 3 of these, all in the same area, would they be $900 each, or would there be a reduction for the other two if we contracted to do all three at one time? Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Wally Jones" <wally@wjonesappraisal.com> 11/1/2010 4:36 PM >>> Keith I can do this for you the fee would be $900 and I would need two weeks. If this is alright we can formalize it with an engagement letter. Thanks, Wally Jones, SRA wk 214-544-0779 cell 972-571-6829 fax 214-544-0789 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Tuesday, October 26, 2010 5:01 PM To: Wally@wjonesappraisal.com Subject: Fwd: 250 W. Sandy Lake Wally, 1 Thanks for calling me back earlier. I'm attaching several documents for you to take a look at concerning the referenced property. First is the plan showing the road improvements in the vicinity of the home in question. Second is the survey work showing the land needed for the expansion, third is the partial release checklist from the mortgage holder. In addition I've attached an exhibit that we prepared showing the aerial image, the proposed paving, and the required right of way. The final attachment is the survey we had prepared to meet the requirements listed in the partial release document. When you have had a chance to look these over, please call me back so we can discuss it further. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 2