Loading...
2014_0306CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: lO 1 The backilow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY e Reduced Pressure Principle ❑ Pressure Vacuum Breaker Double Check Valve C7 Atmosphere Vacuum Breaker Manufacturers `3 Size Model Number C' Located At T tom-- r. L ' `y Serial Number %� (` T(2 Z? The above is certified to be true. n Firm Name (>�DA 121 - Certified Tester SD 6 Firm Address � ✓� Cert. Tester No. I S - Date 3 _L, Gauge # Date last accuracy tested Z — 5---1 3 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check: 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight Opened at Opened at oSid Tight RP- Z/ Leaked o oSid nSid Dsid Leaked p 3 Did not Open o Leaked Reps and Materials Used Test After DC- Closed Closed Tight O Opened at Opened at nsid Repair Tight 13 nSid oSid RP sid The above is certified to be true. n Firm Name (>�DA 121 - Certified Tester SD 6 Firm Address � ✓� Cert. Tester No. I S - Date 3 _L, Gauge # Date last accuracy tested Z — 5---1 3 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy CIIECK ONE: IRRIGATION DOMESTIC FIRELINE BACIGLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE: The bac0ow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker ❑ Double Check Valve G Atmosphere Vacuum Breaker Manufacturer Size Model Number Located At Serial Number The above is certified to be true. Firm Name Certified Tester Firm Address Cert. Tester No. Date Gauge # Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Cheri: 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight ❑ Closed Tight ❑ Leaked ❑ Opened at psid Opened at vSid osid RP- __psid Leaked ❑ Did not Open ❑ Leaked ❑ Reps and Materials Used Test After Repair DC- Closed Tight ❑ Closed Tight ❑ Opened at vSid Opened at vSid vsid RP sid The above is certified to be true. Firm Name Certified Tester Firm Address Cert. Tester No. Date Gauge # Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy GANDARA IRRIGATION INC. 3901 Clifton Dr. Richardson TX 75082 Office: 972 - 671 -3776 Fax: 972 - 664 -9158 Cell: 972 - 467 -3918 Email: eddiegan1 @sbcglobal.net City of Coppell TX 101 RIDGECREST CT This irrigation systemhas been installedin accordance with all applicable State and local laws ,ordinances, rules, regulations and orders. I have tested the system and determined that it has been installed according to the irrigation plan and is properly adjustedfor the most efficient application of water at this time. 1 year warranty from the day of installation. 3--4-1 L( �oyd�4bal..o�s2� ..b21i.QNb;J ?lb,� ..:...