Loading...
2014_0417CHECK ONE: / IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: ur-\-T, PWS I.D. # LOCATION OF SERVICE: S -E;W lam" 1� The backtlow prevention ass Inbly etailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker Double Check Valve C Atmos {phere Vacuum Breaker Manufacturer UUl I ly. VAS size 1 ,/2 tt Model Number Located At 75E--- GOrI(1,Q ' i NAA P Serial Number K& -c, The above is jcertified to be true. Firm Name Firm Address g WS t1ftWtV I�W htit l( , 7 1-1114 { Gauge # W IL (O U Date last accuracy tested � - V - l Certified Testae Cat. Testa No. t'� Date 14 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight 'i Opened at Opened at pSid Tights RP -,:; !"psid Leaked ❑ Leaked ❑ �'' psid pSid Did not Open ❑ Leaked ❑ Repairs and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at pSid Repair Tight ❑ psid pSid RP sid The above is jcertified to be true. Firm Name Firm Address g WS t1ftWtV I�W htit l( , 7 1-1114 { Gauge # W IL (O U Date last accuracy tested � - V - l Certified Testae Cat. Testa No. t'� Date 14 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy