Loading...
2014_0323CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACIOLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: % &6? / �S , 6,e i � l /y i The backflow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacuum Breaker ,2" Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturer rt/j4, t't'S Size ; Model Number 02 L G 1L IQ' Located At N, Serial Number h I S- 3 The above is certified to be true. Firm Name --- 111�� CertiSed Tester►' ,-) Firm Address ,, l E.r, u f r Cert. Tester No. S S 7, Date 3 - z -3 -/� Gauge #/G 2 Z Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Cheri: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight 2f Opened at Opened at osid Tight Leaked / ❑ paid _psid RP- _,psid Leaked o Did not Open ❑ Leaked ❑ Repairs and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at -------- psid Repair Tight ❑ psid osid RP sid The above is certified to be true. Firm Name --- 111�� CertiSed Tester►' ,-) Firm Address ,, l E.r, u f r Cert. Tester No. S S 7, Date 3 - z -3 -/� Gauge #/G 2 Z Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy