Loading...
Cottonwood Est-CS 940613Bury Pit,man June 13, 1994 Bur~ & Piltman, Ira'. (Sm~,ulling Engmt, ers Surxeyors Three I,im'oln (:tqltOl'. Suite 1256 [)alias, Texas 752 ~11 Tel214 770--2555 Fax 21t 991 I)278 Mr. Atul Patel, E.I.T. City of Coppell PO Box 478 Coppell, Texas 75019 Re: 149 Cottonwood Drive Project No. 3001-13 Dear Mr. Patel: Attached, please find a copy of your letter to me dated May 31, 1994, and two (2) revised sets of Drainage Improvement Plans dated June 10, 1994. I would like to address the City's comments in the same order as in the attached letter. Item 1. Item 2. Item 3. Item 4. Item 5. Item 6. Item 7. We have provided a title sheet. We have increased the wall and base thickness of the modified y-inlet to 8-inches. As I discussed with Mr. Griffin on June 3rd and with yourself and Mr. Martin on June 7th, the vertical supports would prohibit the structure from acting like a junction box and taking the flow which currently discharges at this location and putting it into the two (2) 42-inch RCP's which are located along the west property line. I believe all parties have agreed that the vertical supports will not be provided and instead additional steel and supports will be provided in the inlet top as shown on Sheet 1 of 2. We have revised the 471 contour so as not to encroach within the flood- way easement line. AS we discussed on June 7th, the request to grade along the northeast corner of the property would result in a diversion of flow from along the existing flow path and subsequent pond downstream and take the flow north to the existing channel. This would contradict the original design criteria that the original flow characteristics of the site not be altered. Therefore, we have not addressed this comment on the plans. We have referenced City of Coppell Standard Construction Detail Sheet SD10 Section D-D in Construction Note No. 3. The distance between the two (2) 42" RCP's has been increased from 12 to 18 inches. Bury -Pittman Mr. Atul Patel, E.I.T. June 13, 1994 Page 2 Item 8. Item 9. The top of the spillway elevation has been indicated on the profile on Sheet 2 of 2. I believe this item is addressed under Item 3 above. We also have indicated on Sheet 1 of 2 that two (2) reflectorized vertical panels be installed at either end of the modified y-inlet so as to warn vehicular traffic of its presence. I believe we have addressed all of the City's comments and concerns and we look forward to receiving the City's approval of the construction plans in the near future. Please call if you have any questions. Sincerely, Susan E. Weaver, P.E. SEW/Ih Attachments cc: file f:jpiXpatel.sw