Loading...
2014_0320CHECK ONE: IRRIGATION DOMESTIC FIRELINE >". BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OFPWS: �1? f �� �c•(}p�,f� PWS I.D. # LOCATION OF SERVICE: __700 ,w The backilo w prerentl na assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY 0 Reduced Pressure Principle C Pressure Vacuum Breaker 0 Double Check Valve c Atmosphere Vacuum Breaker Manufacturer Wa44 `� Size Model Number 7 ? `f Located At Fi y "� Its I Serial Number The above is certified to be true. Firm Name A boys LIts y- .LS Catified Tester Vi Py S i,,J Firm Address C� a x 7y 7 fA 1 a ot� c Vk jk Cert. Tester No. Date rte- Gauge # 14— Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve .Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight Opened at Opened at psid 'Tilt Leaked -Z. 6 D psid osid RP- ,,,,psid Leaked C Did not Open D Leaked a Repair and Materials Used Test After DC- Closed Closed Tight o Opened at Opened at w�sid Repair Tight D _ _ psid psid RP sid The above is certified to be true. Firm Name A boys LIts y- .LS Catified Tester Vi Py S i,,J Firm Address C� a x 7y 7 fA 1 a ot� c Vk jk Cert. Tester No. Date rte- Gauge # 14— Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy