Loading...
2014_0320 (2)CHECK ONE: IRRIGATION Y DOMESTIC FIR.ELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: L r ? PWS I.D. # LOCATION OF SERVICE: `7ou w • 'f -tee The backilow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker �R' Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturer Fe l"Cb Size eZ i Model Number 860 Located At !2 () -� bq V,4,, f T' Serial Numbers lv Z The above is certified to be true. Firm Name AC f t 011 L f k qQC, Certified T � i l ko <� ) L) .v. Firm Address ` ,VX q 4 k o(�i O Cert. Testy No. ,k t Toni Date / ")51 Gauge # U011607-5 Date last accuracy tested Cf White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly Ist Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed 2.0 Closed Tight k Opened at Opened at nsid Tight ,6 Leaked � ❑ psid nsid RP- nsid Leased ❑ Did not Open ❑ Leaked o Repairs and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at nsid Repair Tight ❑ osid nsid RP sid The above is certified to be true. Firm Name AC f t 011 L f k qQC, Certified T � i l ko <� ) L) .v. Firm Address ` ,VX q 4 k o(�i O Cert. Testy No. ,k t Toni Date / ")51 Gauge # U011607-5 Date last accuracy tested Cf White - Customer's Copy Yellow - City Copy Pink - Tester's Copy