Loading...
2014_0407 (6)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: L, T 1-2 PWS I.D. # t) K- LOCATION OF SERVICE: N0t3 Nw, , The backilow prevention assembly detailed below has been tested and maintained as required by TCEQ red 'lulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY G Reduced Pressure Principle ^ Pressure Vacuum Breaker NC� Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturer Wo T -, 5 Sue d Model Number CYi0wl ( Located At AR60nn 0C IS-3,z4,-3 bl- v Serial Number 7 The above is certified to be true. Y— 5 Firm Name Ac (='• ^e Film Address Pei G." n -7 V1,7 �G � Gauge # >3c ,)6 9.918 Date last accuracy tested 3/14 Certified Tester We-^ v�-" Cent. Tester No. 00074? 1- Date -1 /,) f 1 N White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSET IBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight 16 Opened at Opened at nSid �tO � Ti t 1: fd 116 RP- _____nsid Leaked C3 nsid Sid Leaked ❑ Did not Open o Leaked o Reaairs and Materials Used Test After DC- Closed Closed Tight o Opened at Opened at nsid Repair Tight ❑ nsid nSid RP sid The above is certified to be true. Y— 5 Firm Name Ac (='• ^e Film Address Pei G." n -7 V1,7 �G � Gauge # >3c ,)6 9.918 Date last accuracy tested 3/14 Certified Tester We-^ v�-" Cent. Tester No. 00074? 1- Date -1 /,) f 1 N White - Customer's Copy Yellow - City Copy Pink - Tester's Copy