Loading...
2014_0321CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE: L,2-,-)7 e- /`l-The backflow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY c Reduced Pressure Principle a Pressure Vacuum Breaker ,2' Double Check Valve o Atmosphere Vacuum Breaker Manufacturer f' . Size Model Number �� -� Located At 11 #0 Serial Number / 2d 52- The above is certified to be true. Firm Name i _� allllcertified Testa , �-, /�/l�✓ rt Firm Address,-;),'S -/ �� /u /� l� Cert. Testa No. &1011 IS `' Date Gauge # f G 2 z Z (/& Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight z -,Fd5=_2 psid Leaked p Closed Tight -ET Leaked o 7- Opened at vsid Opened at vsid Did not Open o vsid Leaked O Repairs and Materials Used Test After Repair DC- Closed Tight o Closed Tight o Opened at vsid Opened at vSid _psid RP sid The above is certified to be true. Firm Name i _� allllcertified Testa , �-, /�/l�✓ rt Firm Address,-;),'S -/ �� /u /� l� Cert. Testa No. &1011 IS `' Date Gauge # f G 2 z Z (/& Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy