Loading...
2013_0607CHECK ONE: IRRIGATION DOMESTIC FIRELINE' BAC QWW PREVENTION ASSEMBLY TEST AND MAMTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # - LOCATION OF SERVICE: L ter The bacldlow prevention assembly detailed below has been tested and maintained as regtured by TNRCC reaulwons and is certified to be operating within acceptable Pte- ❑ Rcduccd Pressure Principle ❑/ Double Check valve Manufactum .L,U I 1 n.s Model Number 50 Serial Number 42 R 40 e7 TYPE OF ASSEMBLY • Pressure Vacuimm Breaker • Atmosphere Vacuum Breaker rr Size �-DC Located At Frond O F I-a u ndrY REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Ched: Relief Valve. Air Inlet Check Valve Initial Test DC- Closed PdSS Tight 01 11 -� 513 Lid ❑ Repairs and Materials Used Test After DC- Closed Repair Tight RP Closed Tight Er Opened at Leaked ❑ _ csid ,2. � Opened at I --oszd d Did not Open ❑ 1 Leaked I Closed ❑ Ti ght Opened at at I --.PW -- ----per _osid The above is certified to be tr u. Firm Name (-,S h tom' , V1 C � Firm Address Lh —)+C l50 tl -z , —T�L `75ZXD Gauge # 0'10 Co l q 3 Date last accuracy tested C 7 N3 Certified Tester 1-111 Cart � Tester No v Date _ White - Customer's Copy Yellow - City Copy Pink - Tester's Copy