Loading...
2013_0607CHECK ONE: IRRIGATION DOMESTIC FIRELINE_ i BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # — LOCATION OF SERVICE: Tie bacldlow prevention assembly detailed below has been listed and aoaiawiaed as required by TNRCC regulations and is certified to be operating within acceptable parameters. e Reduced Pressure Principle ca' Double Check Valve Manufacturer TYPE OF ASSEMBLY 0 Pressure Vacuimm Breaker o Atmosphere Vacuum Breaker Size 1 e( -D C Located At L a u n Q r Y REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve AssemblY 1st Check 2nd Check Relief Valve. Air Inlet Check Valve Initial Test DC- Closed Closers Tight e Opened at Opened at .. --°Sid �dSS Tight 92, R Lead ° Dsid - - --psid 11 v�5 -)3 std o a , c� Did not Open ° Leaked o Reps and Materials Used Test After I DC- Closed Closed Tight o I Opened at . �t:sid Repair Tight ° --_- The above is certified to be am Firm Name C`Ys h � �' , Paa'fL±L-P, Certified Tester _ -- Fum Address L Dace , Cert. Tester No vi Gauge # G c10 Q I0 Date last accuracy tested �?� -7—t 3 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy