Loading...
2014_0312 (6)CIIECK ONE: IRRIGATION 17 DOMESTIC. FIRELINE— F-1 BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: L F 621-) 0---a PWS I.D. 4 LOCATION OF SERVICE: 217 Wrangler Drive Coppell, Tx. The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY Reduced Pressure Principle Pressure Vacuum Breaker RV( Double Check Valve H Atznosphere Vacuum Breaker Manufa=er Febco Size 211 Model Nurnber 805Y Located At N. Side @ Street Serial N=bcr 158200 REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check- Relief Valve Air Inlet Check Valve Initial Test DC-Closed Closed Tight Opened at Opened at Tight Q jQ Leaked ------psid ...... psid Leaked Did not Open 0 Leaked Repairs and Materials Used Test After DC-Closed Closed Tight C Opened at Opened at psid Repair Tight 0 psid —_____-_psid RP sid The above is certified to be true. 611 Action Fire Pros Firm Name Allen Steven,�� Certified Tester PO Box 797 Waxahachie BP0009860 3-12-14 Firm Address Cert. Tester No. Date Gauge # 07090476 Date last accuracy tested 9-27-13 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy