Loading...
2013_0311 (2)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL L. L4 V 110 A--r` L LOCATION OF SERVICE: 3 G R (b I `J`� 6 — r� The baclflow prevention assembly detailed below has been tested and maintained as required by TNRCC resulations and is certified to be operating within acceptable parameters. Reduced Pressure Principle Double Check Valve Manufacturer k) (I PRESSURE VACUUM BREAKER Model Number 11 d 1 Serial Number �3 TYPE OF ASSEMBLY ❑ Pressure Vacuum Breaker ❑ Atmosphere Vacuum Breaker Size cS G } si �� Located At %� D�! 0"4 The above is certified to be true. Firm Name Firm Address 3 0� 3 - W Gauge # ) Certified Tester JJ4 JIACI Cent. Tester No. (b Date Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight ❑ RP- �,psid Leaked ❑ Closed Tight 0 Leaked ❑ 8- Opened at , psid Opened at oSid Did not Open ❑ osid Leaked ❑ Reps and Materials Used Test After Repair DC- Closed Tight ❑ Closed Tight ❑ Opened at oSid Opened at oSid oSid RP sid The above is certified to be true. Firm Name Firm Address 3 0� 3 - W Gauge # ) Certified Tester JJ4 JIACI Cent. Tester No. (b Date Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy