Loading...
2013_0104 (16)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: a� k: ►c 1 107- The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. Reduced Pressure Principle C Double Check Valve Manufacturer LA, , fl Model Number IOcl 12T Serial Number A `I Q In 3LJ TYPE OF ASSEMBLY C Pressure Vacuum Breaker C Atmosphere Vacuum Breaker t Size Located At A -Ly -w e � J; The above is certifie dt� d tto— A be true. --�-- / Firm Name � � �: i r l c j e c i" n n Certified Tesw A. Firm Address ,�31a3 MQ,,; R # &X� Cert. Tester No. 6RX)I3S71S Date 11Q1,D0 Gauge # DcI I Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight ❑ Closed Tight C Leaked ❑ Opened at nsid Opened at nSid nSid RP- -7. Y Dsid Leaked ❑ Did not Open ❑ Leaked ❑ Reps and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at nSid Repair Tight ❑ nSid DSid RP sid The above is certifie dt� d tto— A be true. --�-- / Firm Name � � �: i r l c j e c i" n n Certified Tesw A. Firm Address ,�31a3 MQ,,; R # &X� Cert. Tester No. 6RX)I3S71S Date 11Q1,D0 Gauge # DcI I Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy