Loading...
2013_0522 (3)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. ❑ Reduced Pressure Principle ❑ Double Check Manufacturer }.Valve W " (-A Model Numbery - 1� Serial Number J4 oo r, TYPE OF ASSEMBLY ❑ Pressure Vacuum Breaker ❑ Atmosphere Vacuum Breaker Size 1J< Located At Y1 The above is certified to be true. i r j Firm Name �' Certified Testa Firm Address') f) 1 `5 ft&,' "Ak )�d Cat Testa No. 2 59 ? Date Gauge # C/qm n Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight ❑ Opened at Opened at osid Tight ❑ Leaked ❑ i o sid osid RP- __psid Leaked ❑ Did not Open ❑ Leaked ❑ Reps and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at osid Repair Tight ❑ nsid osid RP sid The above is certified to be true. i r j Firm Name �' Certified Testa Firm Address') f) 1 `5 ft&,' "Ak )�d Cat Testa No. 2 59 ? Date Gauge # C/qm n Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy