ST9902-CS111108 (2)
Halie Hernandez
From:Keith Marvin
Sent:Tuesday, November 08, 2011 8:23 AM
To:Glenn Hollowell; Michael Garza; Per Birdsall; Rick Odell; Ted Dutt
Cc:George Marshall; Kenneth Griffin; Scott Latta
Subject:West Sandy Lake
Gentlemen,
I have scheduled a plan review meeting with the engineer on West Sandy Lake for this afternoon at 2:00pm here at
Town Center. The 90ish percent plans are here in our office, and have been since August 9, 2011. The only marks I
see on the plans other than mine belong to George and Scott.
These plans include two traffic signals, nearly a mile of roadway, signage, striping, storm drainage, water, and sewer.
All are welcome to attend the meeting to provide their input. If you're unavailable at the meeting time, please try to
stop by today and look over the plans. Mark whatever stands out to you, and we'll pass your comments along.
Thanks,
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
1