Loading...
ST9902-CS111108 (2) Halie Hernandez From:Keith Marvin Sent:Tuesday, November 08, 2011 8:23 AM To:Glenn Hollowell; Michael Garza; Per Birdsall; Rick Odell; Ted Dutt Cc:George Marshall; Kenneth Griffin; Scott Latta Subject:West Sandy Lake Gentlemen, I have scheduled a plan review meeting with the engineer on West Sandy Lake for this afternoon at 2:00pm here at Town Center. The 90ish percent plans are here in our office, and have been since August 9, 2011. The only marks I see on the plans other than mine belong to George and Scott. These plans include two traffic signals, nearly a mile of roadway, signage, striping, storm drainage, water, and sewer. All are welcome to attend the meeting to provide their input. If you're unavailable at the meeting time, please try to stop by today and look over the plans. Mark whatever stands out to you, and we'll pass your comments along. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 1